My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-03-20_REVISION - C1981008 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2019-03-20_REVISION - C1981008 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 9:22:06 AM
Creation date
4/26/2019 10:56:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
3/20/2019
Doc Name
Reclamation Cost Estimate
From
Tabetha Lynch
To
Brock Bowles
Type & Sequence
SL21
Email Name
TNL
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time: <br /> Scraper Loading Time: 0.60 Minutes <br /> Maneuver and Spread Time: 0.70 Minutes <br /> Job Condition Correction: Site Altitude: 5700 feet <br /> Scraper Push Dozer Source <br /> Altitude Ad': 1.000 1.000 (CAT HB) <br /> Job Efficiency: 0.830 0.830 (CAT HB) <br /> Net Correction: 0.830 0.830 <br /> Travel Time: <br /> Road Condition: Firm,smooth,rolling,dirt/It. surfaced,watered,maintained 3.0 <br /> Haul Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity Travel Time <br /> f m (min) <br /> 1 500.00 0.00 3.00 3.00 2227 0.47 <br /> Haul Time: 0.47 minutes <br /> Return Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity Travel Time <br /> % f m (min) <br /> 1 500.00 0.00 3.00 3.00 2890 0.40 <br /> Return Time: 0.40 minutes <br /> Total Scraper team cycle time: 2.17 minutes <br /> Adjusted for job conditions: 665.53 LCY/Hour <br /> Selected Number of Scrapers: 2 Scraper(s) <br /> Adjusted single scraper team(unit)hourly production: 1,331.06 LCY/Hour <br /> Adjusted multiple scraper team(fleet)hourly production: 2,662.12 LCY/Hour <br /> Unadjusted unit production/hour: 801.84 LCY/Hour <br /> Optimal Number of Scrapers per push <br /> dozer: <br /> JOB TIME AND COST <br /> Fleet size: 2 Team(s) Total job time: 1.88 Hours <br /> Unit cost: $0.637 /LCY Total job cost: $3,190 <br />
The URL can be used to link to this page
Your browser does not support the video tag.