My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-03-20_REVISION - C1981008 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2019-03-20_REVISION - C1981008 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 9:22:06 AM
Creation date
4/26/2019 10:56:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
3/20/2019
Doc Name
Reclamation Cost Estimate
From
Tabetha Lynch
To
Brock Bowles
Type & Sequence
SL21
Email Name
TNL
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOTOR GRADER WORK <br /> Task description: Final grade disturbed areas(not bond released) <br /> Site: New Horizon Mine Permit Action: SL21 Permit/Job#: C1981008 <br /> PROJECT IDENTIFICATION <br /> Task#: 009 State: Colorado Abbreviation: None <br /> Date: 3/20/2019 County: Montrose Filename: 009 <br /> User: TNL <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: CAT 14M Horsepower: 259 <br /> Ripper Attachment: Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $60.13 NA <br /> Operating Cost/Hour: $50.87 100 <br /> Ripper Ownership Cost/Hour: $0.00 NA <br /> Ripper Operating Cost/Hour: $0.00 <br /> Operator Cost/Hour: $28.69 NA <br /> Total Unit Cost/Hour: $139.69 <br /> Total Fleet Cost/Hour: $139.69 <br /> MATERIAL QUANTITIES <br /> Total Area to be graded or ripped: 1.60 acres <br /> Source of estimated acreage: SL21:RN7-1.6 acres <br /> HOURLY PRODUCTION <br /> Average Grader Speed: 3.25 mph <br /> Selected Application: Heavy blading(0-6 mph)-3.25 <br /> Selected Blade Angle: 0 degrees <br /> Effective Blade Length: 14.00 feet <br /> Width of blade overlap per pass: 2.00 feet <br /> Net grading or ripping width per pass: 12.00 feet <br /> Unadjusted Hourly Unit Production: 4.7273 acres/hour <br /> Job Condition Correction Factors Site Altitude: 5700 feet <br /> Source <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.90 (1sh/d,fay.) <br /> Net Correction: 0.9000 multiplier <br /> Adjusted Hourly Unit Production: 4.2545 acres/Hour <br /> Adjusted Hourly Fleet Production: 4.2545 acres/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Grader(s) Total job time: 0.38 Hours <br /> Unit cost: $32.83 per acre Total job cost: $53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.