My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-24_PERMIT FILE - M2019015 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019015
>
2019-04-24_PERMIT FILE - M2019015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 6:29:39 AM
Creation date
4/26/2019 9:45:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019015
IBM Index Class Name
PERMIT FILE
Doc Date
4/24/2019
Doc Name
Permit Document
From
DRMS
To
Castle Rock Construction
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br /> 4 Division of Reclamation, <br /> Mining and Safety <br /> Np,a rt-r=r:, f Na: rti'F <br /> 1313 Sherman St. Room 215 <br /> Denver, CO 80203 <br /> MINING AND RECLAMATION PERMIT <br /> COUNTY CONSTRUCTION MATERIAL MINING OPERATIONS <br /> Permit Number: M-2019-015 <br /> Type of Permit: III <br /> Permit Date: April 24,2019 <br /> (Anniversary date for annual report and fees purposes) <br /> THIS PERMIT is issued by the Mined Land Reclamation Board, Department of Natural Resources, State <br /> of Colorado. <br /> RECITALS <br /> A. The Pennittee, Castle Rock Construction Company of Colorado, LLC, desires to conduct a mining <br /> operation known as Hasser Borrow Pit, for the purpose of extracting Borrow material for <br /> construction. Unless this permit is modified or a separate permit is issued to cover the mining and/or <br /> recovery of other minerals or extractive products, the Permittee will not mine or recover any other <br /> commodities at this site. <br /> B. On April 24, 2019 the Mined Land Reclamation Board (Board) approved the Permittee's application <br /> for this permit and directed that this permit be issued upon the filing with the Division of <br /> Reclamation, Mining and Safety(Division)of perfonriance warranty approved by the Division. Said <br /> warranty has been filed with the Division. <br /> C. If the Permittee desires to extract materials other than those listed in (A), a separate pennit or a <br /> permit modification may be required. <br /> D. On April 24, 2019 the Board made the following findings: <br /> 1. The application for this pen-nit complies with the requirements of the Colorado Mined Land <br /> Reclamation Act for the Extraction of Construction Materials, C.R.S. 34-32.5-101 et sec., as <br /> amended,and with all applicable local, state and federal laws; <br /> 2. The operation will not adversely affect the stability of any significant, valuable, and permanent <br /> man-made structure located within two hundred feet of the Affected Land, except where there is <br /> an agreement between the Operator and the persons having an interest in the structure that <br /> damage to the structure is to be compensated for by the Penmittee if such an agreement cannot be <br /> Y' C04-6r <br /> 1313 Sherman St. Room 215 Denver, CO 80203 P 1303) 866-3567 F(303) 832-8106 https:i/minmg.state.co.us <br /> Jared Polo, Governor I Dan Gibbs, Executive Director i Virginia Brannon, Director <br /> * )Q-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.