Laserfiche WebLink
2.05.4(2)(e) <br />Rill and Gully Inspections <br />Reclaimed areas will be checked annually after snowmelt for the formation of <br />rills and gullies. To document each inspection, a report will be prepared and <br />be made available for inspections as required under Rule 5.02.4. Rills and <br />gullies deeper than nine inches will be noted in the report. By the end of <br />August of the same year, laborers or small equipment will be used to fill, grade <br />or otherwise stabilize rills and gullies deeper than nine inches. The repaired <br />area will be seeded and mulched by the end of the same year. Mulch will be <br />anchored to the ground with netting if appropriate. <br />(vii) Soil Testing Plan <br />Upon reclamation, an analysis of the soils will be made to determine the <br />fertilization requirements of the areas involved. If the analysis shows that the <br />soil is deficient in phosphorus, it will be added to the soil prior to seeding. <br />Other elements may be added the year after seeding. Unneeded fertilization <br />and irrigation will be avoided. Native plants have low potential response to <br />fertilizer and undesirable weed competition is likely. <br />(2)(f) Disposal of Debris, Acid -Forming and Toxic Forming Materials <br />There is no indication that any acid-forming or toxic forming materials will be <br />encountered on site. Refer to Section 2.04.6(a)(iii)(D). Please refer to Section <br />2.05.3(8) for a discussion of the applicant's plans to handle debris and non - <br />coal waste. <br />If sustained combustion of debris or non -coal waste becomes a problem the <br />Applicant will be prepared to react appropriately. Chemical fire extinguishers <br />will be available in the facilities area and on mobile equipment. <br />PR -02 2.05-48 10/12 <br />