Laserfiche WebLink
Monument Dam <br /> Inspection Form <br /> Date: T17119 <br /> Time: 2.' a 0 P/4 <br /> Name of Inspector: yVV' kie- GAICoc� <br /> Current Panel Being Mined: 61`7-Pa,� <br /> ❑ Weekly Inspection Monthly Inspection <br /> Yes No <br /> ❑ Is mining within 1 mile of Monument Dam? <br /> ❑ Q,"' Are there visible surface cracks on the dam? <br /> If yes, indicate length and size of crack. <br /> ❑ ae' Is there evidence of subsided areas on or around the dam? <br /> If yes, indicate where and degree. _ <br /> ❑ W--' Are there bulges on the dam? <br /> If yes, indicate where and degree. <br /> ❑ Gvl" Are there signs of seeps on the dam? <br /> If yes, indicate where and estimated flow. <br /> ❑ IK Are there any other potentially damaging features on the dam? <br /> If yes, describe. <br /> ❑ g/ Are there any recent evidences of slope failure on the landside south of the <br /> dam (perform visual inspection and data analysis of inclinometers)? <br /> If yes, describe. <br /> Notes: <br /> Signature of Inspector: <br /> Inspections are performed under the direction of Mike Peacock, P.E. <br /> If cracks or other potentially damaging features occur, notify Mike Peacock or Kathy <br /> Welt immediately. <br /> (WAMCC-Engineering\ENV PERMTTTING\REG AGENCIES\CDRMS\Monument Dam\Monument Dam Inspection Procedure\Monument Dam Inspection Form) <br />