My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-16_REVISION - C1981019 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2019-04-16_REVISION - C1981019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2019 12:06:52 PM
Creation date
4/22/2019 11:13:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
4/16/2019
Doc Name
Adequacy Review
From
Tri-State Generation and Transmission Association, Inc
To
DRMS
Type & Sequence
MR200
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br /> <br />Rule 4 Performance Standards 4-13 Revision Date: 4/16/19 <br /> Revision No.: MR-200 <br />ponds associate with the Collom Pit be found in Exhibit 7, Item 23. For compliance purposes, in <br />systems that incorporate ponds in a series, CDPS effluent quality parameters will only apply to the <br />last pond in the series that directly discharges into the receiving stream or drainage. Out of pit <br />designed ponds internal to the last pond in the series will be inspected and maintained in the same <br />manner as the “compliance” pond to ensure proper sediment control and design performance. <br /> <br />The sumps along Haul Road A are required to have flow measurement devices at the outflow of <br />each sump. Each sump therefore will have a flume installed at the outflow to measure any flow <br />discharged from each sump. <br /> <br />4.05.8 Acid-forming and Toxic-forming Spoil <br /> <br />Acid forming materials do not exist within the overburden to be removed by the mining operations. <br />A discussion on the overburden at the Colowyo operation has been conducted as set forth in <br />Section 2.04.6. A discussion of the overburden monitoring plan is set forth in Section 2.05. <br /> <br />4.05.9 Permanent and Temporary Impoundments <br /> <br />Colowyo constructs small impoundments on reclaimed areas in accordance with Rule 4.05.9. <br />These small impoundments are essential and basic to the management of the rangeland post- <br />mining land use of livestock grazing and wildlife habitat. The design of post-mining <br />impoundments provides for structures having a vertical height less than five feet from the bottom <br />of the channel to the bottom of the spillway and impound less than two acre-feet of water. As such <br />they are exempt from Division of Water Resources, Office of State Engineer requirements. Water <br />harvesting ditches may also be used to enhance the function of the impoundments, which is <br />consistent with practices employed on adjacent rangelands. <br /> <br />The impoundments collect surface runoff from precipitation events and snowmelt from reclaimed <br />areas. The impoundments do not result in the diminution of the quality or quantity of water for <br />downstream water users. Colowyo is the holder of water rights immediately downstream. During <br />periods of low precipitation, the impoundments may be dry, which is consistent with regional <br />practices on similar rangelands. Since the source of water is surface runoff from revegetated areas <br />the quality of the water will meet the requirements of the intended use. <br /> <br />The post-mining impoundments have slopes of 3h:1v or less to provide easy access to both <br />livestock and wildlife. These impoundments and any associated ditches, while intended to be <br />permanent, will be classified as temporary until the requirements of Rule 4.05.9 are met. Prior to <br />construction, all designs are submitted to the Division. A copy of the as-built design information <br />will be submitted after construction for inclusion into the permit document. In addition, <br />sedimentation ponds that are subsequently approved as part of the post-mining land use, as shown <br />on the hydrology Maps, 41A and 41B, will remain as permanent impoundments after the <br />requirements of Rule 4.05.9 have been met. Please refer to Section 4.05.6 for additional <br />information regarding compliance with Rule 4.05.9(7)(a thru e). <br /> <br />All embankments, impoundments, and associated structures will be revegetated if construction <br />materials are conducive to plant growth. If not, rock or gravel will be used on the embankments.
The URL can be used to link to this page
Your browser does not support the video tag.