My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-18_PERMIT FILE - M2019001
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019001
>
2019-04-18_PERMIT FILE - M2019001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2025 4:50:52 AM
Creation date
4/18/2019 12:15:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019001
IBM Index Class Name
Permit File
Doc Date
4/18/2019
Doc Name
Adequacy Review Response
From
Blue Earth Solutions
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mining disturbance could be at its maximum. At the proposed Lazy Two Pit site, it is assumed <br /> that the mining disturbance will be at its greatest close to midway through the mining operation. <br /> During this scenario, the southern portion of the site has been mined and the pit is partially <br /> backfilled to establish final site drainage. Only about half of the required backfilling, grading, <br /> and revegetation of the pit has been completed at this point. To complete the backfilling, <br /> material from un-mined areas of the site will need to be harvested, placed in the pit, graded, <br /> topsoiled, and revegetated. Additionally, highwalls associated with the active mining face and <br /> approximately 500 feet of side slope on both sides of the mining face will require reclamation. <br /> Mine Operation Aspects and Disturbance Areas <br /> Mining Operation Disturbed <br /> Aspect Area (acres) <br /> Active Mining Area: <br /> 1. Near vertical active mining face and 100-foot wide <br /> A pre-stripped area in anticipation of mining. 13.8 <br /> 2. Near vertical un-reclaimed pit side slopes. <br /> 3. Un-reclaimed pit floor. <br /> Material Harvesting Area and Pit Backfilling <br /> B 1. Material harvest area in un-mined area—78 acres. 108.5 <br /> 2. Partially reclaimed pit, backfilled with harvested overburden <br /> material to grade—30.5 acres. <br /> Miscellaneous Disturbed Areas: <br /> 1. Scale house building area. <br /> C 2.0 <br /> 2. Internal haul roads. <br /> 3. Main site access road. <br /> Final Reclamation: <br /> D 1. Seeding. NA <br /> 2. Re-seeding. <br /> Total Disturbed Area 124.3 <br /> Diversions and Impoundments <br /> The existing grade of the proposed permit area generally drains from north to south. Stormwater <br /> that falls directly on disturbed areas will generally drain to the mine pit and allowed to infiltrate. <br /> The active mine pit will effectively contain stormwater flows and prevent surface runoff from <br /> disturbed areas of the site. Stormwater not encountering disturbed areas will be allowed to drain <br /> within natural drainage patterns. <br /> Material Processing and Associated Facilities <br /> A portable processing facility for product crushing and screening will be brought to the site and <br /> used as needed. The facility will be located within the pit close to where active mining is <br /> Lary Two Pit <br /> DBMS 112 Permit Application Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.