EXHIBIT C <br /> Mining Plan <br /> (a.) Mining will commence April 2019 and continue till no more sand is needed 2045 possible. <br /> (b.)There is no salvageable material to remove or to stock pile.Sand source is on top in creek. <br /> (c.) No overburden <br /> (d.)The deposit thickness varies of thickness most does not exceed 6 ft. <br /> (e.)There is no major components of the mining operations such as office, shop, buildings. <br /> Haul road is an existing road the owner uses to check on his livestock.There is an old <br /> road there that has been used and is sufficient for this operation.This is a very low <br /> production operation. On average there will be 1.5 loads per week to be hauled away from <br /> site. <br /> (f.)There should be no major disturbances to the land.We are removing the sand from the creek. <br /> There will be no stockpiles, material will be directly loaded into equipment and hauled off. <br /> We do not want the sand contaminated with clay or dirt so we will be staying above the <br /> bottom of the creek and away from the sides of the creek.The side slope should only be a <br /> couple feet deep and the sand slope should be a 3 to 1 at least. Head cutting will be prevented <br /> by staying away from creek sides will keep mining inside on the side boundaries and markers <br /> will be in place to mark the end boundaries to keep mining contained in boundaries. <br /> (g.)The existing roads are 15 feet wide and they will be used for truck traffic.No improvements <br /> Are necessary.There will be runoff from area. <br /> (h.) No water is need for this operation. <br /> (i)No.ground water will be incurred.Surface water will flow through the pit area.This is expected. <br /> Mining operation will try to be conducted in off flood season. If water is encountered we will <br /> Cover exposed water with 2 feet of sand and raise our mining up 2 feet to keep water covered. <br />