Laserfiche WebLink
Recelvep <br /> C OLORADO DIAT R NATION, MINING AND SOIfftolq <br /> 187 1313 Sherman S _03)rado 80203 ph(303)866-3567 <br /> ACY/thm <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> File No.: M- (7U "1 <br /> Site Name: ,,;I n %S c�,n 7,w�% �/ �' �' S o <br /> iC <br /> o'�. IV <br /> County /,,� 2n e 5 c TR# (DBMS Use onlyZ a O <br /> Permittee: IN h. e �� -`�< =- 7 �c �T r RECEIVEC �. c <br /> Operator(If Other than Permittee): APR 17 2019 f <br /> 0 <br /> J) DIVISION OF RECUMT' <br /> Permittee Representative: c�I-k (�C�mac, n e' ..�.,� aT <br /> C l , <br /> Please provide a brief description of the proposed revision: 4, c- � -e <br /> 0 <br /> D � <br /> 0 <, <br /> 0 <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application �1 W <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 1 IOc, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock (not DMO) $175 ❑ <br /> 110d, 112d(l, 2 or 3) $1006 ❑ <br />