Laserfiche WebLink
<br /> <br /> <br />RCE Liability Reduction Explanation: <br />TR93 Modified the approved design of the 2nd Thickener Tank removing the Caisson <br />Supports approved in TR91. TR91 RCE increased the liability by $75,058.73. The new <br />design RCE has a reclamation liability of $63,287. The difference is $11,771.73 in reduced <br />reclamation liability with the design proposed in TR93 <br /> <br /> <br />COST SUMMARY WORK <br /> <br />Task description: 2nd Thickener tank Alternate design <br />Site: Foidel Creek Mine Permit Action: TR93 Permit/Job#: C1982056 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 4/4/2019 County: Routt Filename: C056-000 <br />User: TNL <br />Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br />001 Demo 2nd Thickener Tank and associated <br />structure <br />DEMOLISH 1 60.00 $49,795 <br /> <br /> <br /> <br />SUBTOTALS: <br /> <br /> <br />60 <br /> <br />$49,795 <br /> <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $1,006 <br />Performance bond: 1.05 Total = $523 <br />Job superintendent: 30.00 Total = $2,192 <br />Profit: 10.00 Total = $4,980 <br /> TOTAL O & P = $8,700 <br /> CONTRACT AMOUNT (direct + O & P) = $58,495 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): $0 Total = $0 <br />Engineering work and/or contract/bid preparation: 4.61 Total = $2,697 <br />Reclamation management and/or administration: 3.58 $2,094 <br /> <br />CONTINGENCY: 0.00 Total = $0 <br /> <br />TOTAL INDIRECT COST = $13,490 <br /> <br />TOTAL BOND AMOUNT (direct + indirect) = $63,285 <br /> <br />