My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-16_REVISION - M1998067
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998067
>
2019-04-16_REVISION - M1998067
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 9:15:54 AM
Creation date
4/16/2019 11:30:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998067
IBM Index Class Name
REVISION
Doc Date
4/16/2019
Doc Name
Request for Technical Revision
From
Summit Brick Co
To
DRMS
Type & Sequence
TR1
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERMIT#: M-1998-067 <br /> INSPECTOR'S INITIALS: TC1 <br /> INSPECTION DATE: August 1,2018 <br /> Signs and Markers: The permit sign was properly posted (see Photo 5). Only three boundary markers were <br /> located and insufficient to delineate the affected area boundary as required. The Exhibit C mining map <br /> submitted with the permit application delineates three different boundary types: a) the permit boundary; b) <br /> affected area boundaries for areas A through H; and c) clay area boundaries for areas A through H. The DRMS <br /> regulations (C.R.S. 32-34-???) require the affected area boundaries be marked. As such, Area F (the current <br /> active area) is required to be marked. The lack of markers delineating the Area F boundary is cited as Problem <br /> No. 2 on page 1 of this report. The Summit Brick &Tile Co. will also need to commit to marking the other areas <br /> affected area boundaries prior to initiating mining in Areas A through E, G and H. <br /> Permit Stipulations: Prior to conducting any mining in areas B,C,D,E,G, and H, the operator will submit an <br /> updated mining plan map which clearly details the mining plan as per areas A and F of the current Mine Plan <br /> Map. <br /> Storm Water MGT Plan: No oil or fuel spills observed. <br /> Topsoil: A topsoil stockpile was observed on the west side of the area being worked in Area F (see Photo 6). <br /> Structures: No structures were observed within 200 feet of the affected area. <br /> Please contact Tim Cazier (303)866-3567 ext. 8169 or email at tim.cazier@state.co.us if you have any questions <br /> regarding this report. <br /> PHOTOGRAPHS <br /> Le <br /> R <br /> C) <br />' �j x/ - - • _ � sir <br /> 47 <br /> • <br /> R y. <br /> — . a <br /> r <br /> �:.'� artn�.',.�.r�•-J�...c M: s'^2`.i. i- �`�2J�, - `T�: �' �. .. Yc}s v4 <br /> Photo 1. Benched highwall in Area F (looking NW).~ <br /> Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.