Laserfiche WebLink
MOTOR GRADER WORK <br /> <br />Task description: Final Grade Long-Term Spoil Area <br />Site: Keenesburg Strip Mine Permit Action: MT7 Permit/Job#: C1981028 <br /> <br />PROJECT IDENTIFICATION <br />Task #: A03 State: Colorado Abbreviation: None <br />Date: 4/11/2019 County: Weld Filename: C81028 <br />User: ZTT <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14M Horsepower: 259 <br />Ripper Attachment: Shift Basis: 1 per day <br /> Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $60.13 NA <br />Operating Cost/Hour: $50.87 100 <br />Ripper Ownership Cost/Hour: $0.00 NA <br />Ripper Operating Cost/Hour: $0.00 <br />Operator Cost/Hour: $45.64 NA <br />Total Unit Cost/Hour: $156.64 <br />Total Fleet Cost/Hour: $156.64 <br /> <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 42.94 acres <br />Source of estimated acreage: 2018 ARR <br /> <br />HOURLY PRODUCTION <br />Average Grader Speed: 1.50 mph <br />Selected Application: Finish grading (0-2.5 mph) - 1.5 <br />Selected Blade Angle: 30 degrees <br />Effective Blade Length: 12.10 feet <br />Width of blade overlap per pass: 2.00 feet <br />Net grading or ripping width per pass: 10.10 feet <br />Unadjusted Hourly Unit Production: 1.8364 acres/hour <br />Job Condition Correction Factors Site Altitude: 4000 feet <br /> Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.90 (1sh/d, fav.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: 1.6527 acres/Hour <br />Adjusted Hourly Fleet Production: 1.6527 acres/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: 25.98 Hours <br /> <br />Unit cost: <br /> <br />$94.78 <br /> <br />per acre <br /> <br />Total job cost: <br /> <br />$4,070 <br />