My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-15_REVISION - C1981028
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2019-04-15_REVISION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2019 9:15:35 AM
Creation date
4/16/2019 10:50:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
4/15/2019
Doc Name Note
Revised Cost Estimate
Doc Name
Reclamation Cost Estimate
From
Zach Trujillo
To
Rob Zuber
Type & Sequence
MT7
Email Name
ZTT
RDZ
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont’d Task # 000 Page 25 of 28 <br /> <br />CIRCES Cost Estimating Software <br />Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.500 Minutes <br />Truck Load Time: 1.504 Minutes Adjusted for site altitude: 1.504 Minutes <br />Truck Maneuver and Dump <br />Time: <br />0.90 Minutes Adjusted for site altitude: 0.900 Minutes <br /> <br />Truck Travel (Haul & Return) Time: Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, <br />maintained 3.0 <br /> <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 3400.00 1.00 3.00 4.00 2665 1.439 <br />Haul Time: 1.439 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 3400.00 -1.00 3.00 2.00 2905 1.205 <br />Return Time: 1.205 minutes <br />Total Truck Cycle Time: 5.548 minutes <br />Loading Tool unit <br />Production <br /> <br />425.03 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />352.77 <br /> <br />LCY/Hour <br />Truck Unit Production <br />153.53 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />127.43 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />3 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />3 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 382.28 LCY/Hour <br />Adjusted single truck/loader team production: 352.77 LCY/Hour <br />Adjusted multiple truck/loader team production: 352.77 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 1.38 Hours <br /> <br />Unit cost: <br /> <br />$1.486 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$722 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.