My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-15_REVISION - C1981028
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2019-04-15_REVISION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2019 9:15:35 AM
Creation date
4/16/2019 10:50:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
4/15/2019
Doc Name Note
Revised Cost Estimate
Doc Name
Reclamation Cost Estimate
From
Zach Trujillo
To
Rob Zuber
Type & Sequence
MT7
Email Name
ZTT
RDZ
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRUCK/LOADER TEAM WORK <br /> <br />Task description: Clean sediment from Pond 2, dispose in B-Pit <br />Site: Keenesburg Strip Mine Permit Action: MT7 Permit/Job#: C1981028 <br /> <br />PROJECT IDENTIFICATION <br />Task #: I01 State: Colorado Abbreviation: None <br />Date: 4/11/2019 County: Weld Filename: C81028 <br />User: ZTT <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST Shift basis: 1 per day Equipment Description <br />Truck Loader Team -Truck: Generic 12-18 cy, 6x4 <br />-Loader: Cat 320D L 9’-6” Stick <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance –Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 3,500 Gal. <br /> <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Excavator Load Area Dump Area Motor <br />Grader <br />Water Truck <br />%Utilization-machine: 100 100 NA NA 25 25 <br />Ownership cost/hour: $22.72 $33.90 NA NA $60.13 $12.39 <br />Operating cost/hour: $44.95 $36.00 NA NA $12.72 $6.50 <br />%Utilization-riper: NA 0 NA NA NA NA <br />Ripper own. <br />cost/hour: NA $0.00 NA NA $0.00 $0.00 <br />Ripper op. cost/hour: NA $0.00 NA NA $0.00 $0.00 <br />Operator cost/hour: $25.65 $36.93 NA NA $45.64 $0.00 <br />Unit Subtotals: $93.31 $106.84 NA NA $118.49 $18.89 <br />Number of Units: 3 1 0 0 1 1 <br />Group Subtotals: Work: $386.77 Support: $0.00 Maint: $137.38 <br />Total work team cost/hour: $524.15 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 486 CCY Swell factor: 1.000 <br />Loose volume: 486 LCY <br />Source of estimated volume: Coors Site Plan; assume 4” deep sediment <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00
The URL can be used to link to this page
Your browser does not support the video tag.