My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-15_REVISION - C1981028
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2019-04-15_REVISION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2019 9:15:35 AM
Creation date
4/16/2019 10:50:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Revision
Doc Date
4/15/2019
Doc Name Note
Revised Cost Estimate
Doc Name
Reclamation Cost Estimate
From
Zach Trujillo
To
Rob Zuber
Type & Sequence
MT7
Email Name
ZTT
RDZ
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEMOLITION WORK <br /> <br />Task description: Structural demolition <br />Site: Keenesburg Strip Mine Permit Action: MT7 Permit/Job#: C1981028 <br /> <br />PROJECT IDENTIFICATION <br />Task#: G01 State: Colorado Abbreviation: None <br />Date: 4/11/2019 County: Weld Filename: C81028 <br />User: ZTT <br />Agency or organization name: DRMS <br /> <br />UNIT COSTS Location adjustment: <br />96.90 % <br />Structure or <br />Item Description <br /> <br />Dimensions Demolition Menu <br />Selection <br /> <br />Quantity <br /> <br />Unit <br /> <br />Unit <br />Cost <br /> <br />Total Cost <br />Powder magazine <br />-cinder block <br />walls <br />21' x 28' x <br />10'h <br />Bldg. (SN) <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. <br />10,000 ft. haul <br />5,880.00 CF $0.19 $1,105.44 <br />Powder <br />magazine- <br />concrete floor <br />21' x 28' Demo. and on-site <br />disposal in existing <br />pit, 4 in. thick - <br />Max. 10,000 ft. haul <br />588.00 SF $0.55 $325.16 <br />Skid mounted <br />garage <br />28' x 26' x <br />18'h <br />Bldg. (SN) <br />demo./on-site <br />disposal in existing <br />pit or cut - Max. 50 <br />ft. push <br />13,104.00 CF $0.18 $2,332.51 <br /> <br />Job Hours: 8.00 <br />Subtotal <br />(unadjusted): $3,763.11 <br />Total Cost <br />(adjusted for <br />location): $3,646.45 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.