Laserfiche WebLink
Coal Ridge No. 1 Mine C-1984-065: MT-08 April 2, 2019 <br /> <br />Page 27 of 27 <br /> <br />Average Travel Speed: 50.00 mph <br /> <br />Total Non-Roadable Mob/Demob Cost * <br />‘* two round trips with haul rig: $2,875.05 <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: $53.27 <br /> <br />Transportation Cycle Time: <br /> Non-Roadable <br />Equipment <br /> <br />Roadable <br />Equipment <br />Haul Time (Hours): 0.50 0.50 <br />Return Time (Hours): 0.50 0.50 <br />Loading Time (Hours): 0.30 NA <br />Unloading Time (Hours): 0.30 NA <br />Subtotals: 1.60 1.00 <br /> <br />JOB TIME AND COST <br /> <br /> Total job time: 3.20 Hours <br /> <br />Total job cost: <br /> <br />$2,928 <br />