Laserfiche WebLink
5. The PAP and map 13 have been updated showing Topsoil Stockpile #1 <br />as the large pile (28,808 LCY) and Topsoil Stockpile #2 as the small pile south <br />of Highway 12 and west of the refuse belt. Updated pages 36, 37, 38, 39, 40, <br />41, 55, and 56 of Section 2.05 are attached. <br />6. NECC staff took field measurements and used some rough calculation to <br />confirm that the large topsoil pile (Topsoil Stockpile #1) is about 23,652 BCY. <br />The rough estimation measured Topsoil Stockpile #1 at 23,981 BCY. NECC <br />staff also measured Topsoil Stockpile #2 (small pile south of Highway 12 and <br />west of refuse conveyor) to be 1,939 BCY. <br />7. The suggested language was added to pages 20 and 20a of Section <br />2.05. <br />8. The revegetation plan in the PAP is current; however, the reference area <br />located on the Colorado Parks and Wildlife land has been disturbed. New Elk <br />will have to submit a Permit Revision to change the reference area. New Elk <br />staff will attempt to get a revision submitted within the calendar year, once the <br />long-term future for New Elk Mine becomes clearer. <br />9. Map 13 is attached and has been updated to show on-ground conditions. <br />The updated Map 13 is attached. <br />Sincerely, <br />~~ <br />Nicholas Mason