Laserfiche WebLink
WILLIAMS FORK MINING COMPANY <br /> SAND AND GRAVEL SITE <br /> Table E-2. Example of a typical reclamation schedule at the proposed sand and gravel operation. <br /> Approximate time <br /> Activity Frame for Activity <br /> Site Preparation <br /> Topsoil removal to stockpiles(1) 1985-2006 <br /> Overburden removal to stockpiles (1) 1985-2006 <br /> Topsoil and overburden stockpile stabilization Fall following stockpile construction <br /> Regrading <br /> Regrade mining areas 1, 2, 3(1) 1996-1998 <br /> Regrade mining areas 4, 5, 6(1) 2014-2016 <br /> Topsoil Replacement <br /> Replace topsoil around mining areas 1-3 1996-1998 <br /> Replace topsoil around mining areas 4-6 2014-2016 <br /> and on associated disturbance areas <br /> Seedbed Preparation and Seeding <br /> Prepare seedbed 1996-1998, 2014-2016 <br /> Seed perennials Fall following stockpile construction <br /> Post Reclamation Period 1999-2001, 2014-2016 <br /> Monitor plant establishment Annually for 3 years <br /> Control noxious weeds Annually for 3 years <br /> Control domestic grazing Annually for 3 years <br /> Control erosion Annually for 3 years <br /> (1) Actual date depends on pit development. <br /> FVUjsh 4/19 <br /> [sgpermit] <br /> Revision: 7-Q-v4 <br /> Approved: <br />