My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-13_REVISION - M1984168 (9)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984168
>
2019-04-13_REVISION - M1984168 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 9:23:45 AM
Creation date
4/15/2019 10:15:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984168
IBM Index Class Name
REVISION
Doc Date
4/13/2019
Doc Name
Request for Technical Revision
From
Williams Fork Mining
To
DRMS
Type & Sequence
TR7
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OP COO <br /> y�T �9 TR07COLORAD� ECLAMATION, MINING AND SAFETY <br /> $ <br /> * * 1313 She rover,Colorado 80203 ph(303)866-3567 <br /> 1876 ACYlthm ' RECEIVED <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET APR 12 2019 <br /> 84-168 Williams Fork Pit WSIONOFREC�TION <br /> File No.: M- Site Name: MINING"seFETy <br /> County Moffat TR# (DRMS Use only) <br /> Permittee:Williams Fork Mining Company 3 3 <br /> Operator(If Other than Permittee): a C* <br /> Permittee Representative: G ra rl a m Roberts <br /> 00 <br /> Please provide a brief description of the proposed revision: <br /> Revise mining and reclamation plan to resume and extend mining and reclamation within the <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted c h <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, ,�� O <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type- Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 1 IOc, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> I IOd, 112d(1, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.