Laserfiche WebLink
Closure Cost Estimate <br /> Haul Material <br /> Project Name: Study Cell TR113-Reclamation Plan <br /> Date of Submittal: 4/2/2019 <br /> File Name: Study Cell.xlsm <br /> Model Version:Version 1.4.1 <br /> Cost Data:User Data <br /> Cost Data File:SRCE_CCV_bonding_cost_data_fiie.xlsm <br /> Cost Estimate Type:Surety Cost Basis:Northern Nevada Bonding <br /> Generic Material Hauling-Cost Summary <br /> Labor Equipment Materials Totals <br /> Hauling/CrustVScreen/Compact $1,480 $9,224 N/A $10,704 <br /> Cover Placement Cost $0 $0 N/A $0 <br /> Topsoil Placement Cost $0 $0 N/A $0 <br /> Ripping/Scarifying Cost $617 $2,490 N/A $3.107 <br /> Subtotal Earthworks $2,097 $11,714 $0 $13,811 <br /> Revegetation Cost $0 $0 $0 $0 <br /> TOTALSI $2,097 11,714 0 513,811 <br /> Generic Material Hauling-User Input <br /> Facility Description Physical Hauled Material Crushing&Screening Cover Growth Media <br /> Distance Slope Distance Distance <br /> Final Average Material from to Loss to to Slope to Slope Distance to Slope <br /> Description Surface Ripping Volume Borrow Borrow Crush Screen Crushing/ Placement to Cover Cover to Growth Media Growth Material to <br /> (required) ID Code Type Area Distance Required Source(1) Source Material Material Screening Location(2) Placement Thickness Borrow Borrow Thickness Stockpile Stockpile <br /> acres 8 cy R %grade % it %grade in 0 %grade in 8 %grade <br /> 1 Remove Ore Heap Leach 1.68 12,687 1,126 2.0 <br /> 2 Remove DCF and Liner Heap Leach 1.68 2 12,587 1,126 2.0 <br /> Notes: <br /> 1.Input distance to crusher if material to be crushed <br /> 2.Input distance from crusher to placement if material to be Crushed <br /> 3.If Slope from facility to borrow source is>20,downhill travel time may be underestimated due to limitation of uphill travel time curves and downhill speed tables from CAT Handbook(see Productivty Sheet) <br /> Density of 1.43 tonsicy <br /> Generic Material Hauling-User Input(cont) <br /> Hauling Material Cover Growth Media Revegetation <br /> Each Cover Growth <br /> Material Fleet Size Compact Placement Media Growth Media <br /> Description Haul Hauling (from/to After Cover Equipment Maximum Material Equipment Maximum Seed Mulch Fertilizer Scarify/ Scarifying/ <br /> (required) Material Type Fleet crusher) Placement? Material Type Fleet Fleet Size Type Fleet Fleet Size Mix Type Type Rip? Ripping Fleet <br /> (select) (select) (user override) (select) (select) (user override) (select) (select) (user override) (select) (select) (select) (select) (select) <br /> 1 Remove Ore Granite-brok XLarge Truck No No <br /> 2 Remove DCF and Liner Gravel XLarge Truck No Yes Large Dozer <br /> Notes: <br /> 1.Material Types are used for density correction based on material densities in Caterpillar Performance Handbook material density table <br /> Generic Material Hauling-Load,Haul,Place and Grade <br /> Material Haulage Crush and/or Compact <br /> Total Total <br /> Material Final Material Number of Hauling Hauling Crush/ Compact Compact Load/Haull <br /> Description Volume Material Haulage Fleet Trucks/ Total Fleet Labor Equipment Screen Labor Equipment Place <br /> (required) to Crusher Volume Fleet Productivity Scrapers Hours Cost Cost Cost Cost Cost Cost <br /> cy cy LCY/hr $ $ 5 $ $ $ <br /> 1 Remove Ore 12,587 12,587 793C/994D 1,047 1 12 $740 $4,612 $0 $0 $0 $5,352 <br /> 2 Remove DCF and Liner 12,587 12,587 793C/994D 1,085 1 12 $740 $4,612 $0 $0 $0 $5,352 <br /> 25,174 25,174 24 1,480 9,224 $0 $0 o $10,704 <br /> Notes:Final Material Volume includes allowance for additional material hauled to crushing/screening plant based on Loss to Crushing/Screening input above. <br /> Generic Material Hauling-Cover and Growth Media Costs <br /> Cover Placement Growth Media Placement <br /> Cover Cover Total Total Total Cover Growth Media Growth Media Number of Total Total Total Topsoil <br /> Description Placement Fleet Number of Total Fleet Labor Equipment Placement Growth Media Placement Fleet Trucks/ Total Fleet Labor Equipment Placement <br /> (required) Cover Volume Fleet Productivity Trucks/Scrapers Hours Cost Cost Cost Volume Fleet Productivity Scrapers Hours Cost Cost Cost <br /> cy LCY/hr $ $ $ cy LCY/hr $ $ $ <br /> 1 Remove Ore $0 $0 $0 0 $0 $0 $0 <br /> 2 Remove DCF and Liner $0 $0 $0 0 $0 $0 $0 <br /> 0 0 $0 $0 SO $0 <br /> Generic Material Hauling-Scarifying/Revegetation Costs <br /> Scarifying/ Scarifying/ Total <br /> Total Scarifying/ Ripping Ripping Scarifying/ Revegetation Revegetation Revgetation Total <br /> Description Surface Ripping Labor Equipment Ripping Labor Equipment Material Revegetation <br /> (required) Area Hours Cost Cost Cost Cost Cost Cost Cost <br /> acres hrs $ $ $ $ $ $ $ <br /> 1 Remove Ore 1.68 $0 $0 $0 $0 $0 $0 $0 <br /> 2 Remove DCF and Liner 1.68 10 $617 $2,490 $3.107 $0 $0 $0 $0 <br /> 3.36 10 $617 $2,490 $3,107 $0 $0 $0 $0 <br /> 4/2/2019 <br /> Page 1 of 1 Haul Material <br />