My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-10_ENFORCEMENT - M2002120
>
Day Forward
>
Enforcement
>
Minerals
>
M2002120
>
2019-04-10_ENFORCEMENT - M2002120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 6:03:33 AM
Creation date
4/11/2019 2:00:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002120
IBM Index Class Name
ENFORCEMENT
Doc Date
4/10/2019
Doc Name
Consent Agenda Item
From
DRMS
To
Bestway Concrete
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M2002-120 <br /> Consent Agenda Form <br /> April 11, 2019 <br /> Page 2 of 3 <br /> STAFF RECOMMENDATION: <br /> Violation: <br /> Find a violation of C.R.S. 34-32.5-116(4)(i), for failure to protect areas outside of the affected land from <br /> slides or damages occurring during the mining operation. <br /> Cease and Desist Order: <br /> Issue a Cease and Desist Order prohibiting any further mining activities, except those activities <br /> approved by the Division, in writing, as necessary to comply with the conditions of a Board Order, <br /> prevent damage to off-site areas, or to protect public health and safety, until corrective actions have been <br /> resolved to the satisfaction of the Division and the MLRB. <br /> Corrective Action(s): <br /> Require the Operator to submit a permit amendment to increase the size of the current 112c Reclamation <br /> Permit to include, at a minimum, the affected lands outside of the approved permit boundary. The <br /> Operator shall submit an amendment application complete for filing purposes within 90 days of the <br /> mailing date of the Board Order. <br /> Civil Penalty: <br /> Pursuant to 34-32.5-124(7), a person who violates any provision of a permit issued shall be subject to a <br /> civil penalty of not less than $100.00 per day, nor more than $1,000.00 per day for each day during <br /> which such violation occurs. In this case, the civil penalty will be calculated from the date of the <br /> Reason to Believe a Violation Exists letter(April 4, 2019) to the date of the May 22, 2019 Board <br /> Meeting—48 days; the Board may assess a civil penalty of$4,800 to $48,000.00. <br /> The Board will assess a civil penalty of$100.00 per day of violation for 48 days, for a civil penalty <br /> amount of$4,800 with all but $500.00 suspended if the Operator complies with the corrective action. <br /> The portion of the civil penalty not suspended, $500.00, shall be due and payable within thirty(30) days <br /> of the effective date of the Board Order. If the Operator does not comply with the corrective actions set <br /> forth in the Order by the corrective action date specified, then the suspended penalties, $4,800.00, shall <br /> be due and payable. Failure to submit any due and unpaid civil penalties shall result in immediate <br /> submittal of such penalties to State collections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.