Laserfiche WebLink
Vol. 2C (Continued) <br /> Appendix Exh7-14F West Pit Fill Ditch& East Taylor Pond Ditch Channel Designs <br /> (Permanent) <br /> Appendix Exh7-14G Gulch A Ditch & Section 11 Ditch Channel Designs (Permanent) <br /> Appendix Exh7-14I East Taylor Ditch <br /> Appendix Exh7-14J (reserved for future use) <br /> Appendix Exh7-14L Taylor Ditch <br /> Appendix Exh7-14M (reserved for future use) <br /> Appendix Exh7-140 Section 16 Pond Ditch Extension, Section 16 Pit <br /> Appendix Exh7-14P Small Area Exemption <br /> Appendix Exh7-14Q South Taylor Haul Road Ditch(Not Permanent) <br /> Appendix Exh7-14R East Pit Reclamation Area, Prospect Ditch,North Trib East Pit <br /> Ditch, Final East Pit Ditch <br /> 15) Stability Evaluation, Existing Sedimentation Pond Embankments, CTL/Thompson Inc. <br /> 1998 <br /> 16) Adjudicated and permitted surface and groundwater locations within 1 mile of the Permit <br /> boundary <br /> 17) Small Area Exemption, Topsoil Pile 15G and Associated Access Road <br /> 18) Gulch A Small Area Exemption <br /> Vol. 2D <br /> SEDCAD Modeling and Pond Design Maps—Sedimentation Ponds, 2002 <br /> Introductory Text <br /> Methodologies and Assumptions for Sediment Pond Design <br /> Streeter Pond–001 A <br /> Work Area Pond–002A <br /> Gossard Pond–003A <br /> Gulch A Pond–004A <br /> Stoker Siding Pond–005A <br /> Rail Loop Pond–006A <br /> Vol. 2E <br /> SEDCAD Modeling and Pond Design Maps— Sedimentation Ponds, 2002 <br /> Prospect Pond–007A <br /> West Pit Pond–008A <br /> Section 16 Pond–009A <br /> East Taylor Pond–010A <br /> Taylor Pump Pond <br /> (Note: For hydrology information in the South Taylor Area, See Volume 13, Exhibit 7-20.) <br /> Exh. 7-14TOC-2 Revision Date: 12/13/18 <br /> Revision No.: TR-130 <br />