RULE 4 PERFORMANCE STANDARDS <br />356 feet + 20% swell = final thickness = 1.05 <br />363 feet + 49 feet initial thickness <br />The original permit application utilized at 17% swell factor to project the anticipated postmining <br />topography. <br />During the initial permit review process the anticipated swell factor was subsequently revised to <br />23% to ensure that the Streeter Fill volume was adequate to allow for sufficient pit development. <br />At that time, excess swell was anticipated to raise the elevation of the postmining topography by <br />about 5.3 feet, compared to the premining topography. As explained above, in 1984, as part of the <br />1983 Annual Report, Colowyo further refined its estimates based on measurements to date, and <br />currently uses an overall 20% swell factor for estimating purposes. As indicated in the Annual <br />Reports, the stripping accomplished by draglines can vary from 40% to 45% and from 55% to 60% <br />for truck/shovel. Swell factor will continue to be monitored and the postmining topography <br />adjusted, if necessary. Any adjustments will be minor, will be done gradually and will not affect <br />the reclamation plan or postmining land use. Particularly, drainage channel gradients will not be <br />changed; an entire drainage channel elevation could possibly be revised, but the gradient would <br />remain as designed. If a change would be necessary, the dump plan elevations would be revised <br />as appropriate. <br />In order to verify accuracy of the overburden swell factor predictions and postmining topography <br />projections in the initial permit term, Colowyo has committed to the following requirements: <br />"The applicant has committed, within the application to monitor the topographic <br />configuration of the pit and the postmining reclaimed surface of the mined area, in order <br />to verify the accuracy of the overburden swell factor and postmining topography <br />projections. As specified in the application, monitoring for these purposes shall consist of <br />annual survey, utilizing field survey or aerophotogrammetric methods approved by the <br />Division. Using maps depicting the annual surveyed configuration of the pit and reclaimed <br />areas, the permittee will determine the overall overburden swell and the resultant variation <br />between premining and post -mining topographic elevation for the mined areas. Further, <br />the permittee will ascertain, record and report to the Division the proportions of overburden <br />excavated using truck/shovel and dragline methods. The maps and a report presenting the <br />methodology and results of the required determinations will be submitted to the Division <br />for review and approval on an annual basis. The permittee will continue these monitoring <br />procedures on an annual basis until the Division determines the results sufficient to <br />adequately verify overburden swell factor projections and approves, in writing, cessation <br />of monitoring. The maps will include a comparison of proposed and actual reclaimed <br />contours and will be submitted annually throughout the permit term." Excerpted from <br />ColoMo Findings and Proposed Decision to Approve Permit, File No. C-1981-019, <br />September 28, 1982. <br />The results of the monitoring can be found in the 1983 — 1982 Annual Reports. <br />Rule 4 Performance Standards 4-42 Revision Date: 11/27/18 <br />Revision No.: TR -129 <br />