Laserfiche WebLink
EXHIBIT B <br /> Aggregate Industries-WCR, Inc. <br /> Inert Material Acceptance Policy <br /> General Conditions <br /> Importing and backfilling of inert materials at Aggregate Industries-WCR mine sites requires <br /> notification to and approval by the Colorado Division of Reclamation, Mining and Safety(DRMS). In <br /> support of the required notice of intent to DRMS, an affidavit must be submitted that the material is <br /> clean and inert as defined in DRMS rules, as follows: <br /> "Inert Materials" means non-water-soluble and non-putrescible solids together with such minor <br /> amounts and types of other materials, unless such materials are acid or toxic producing, as will <br /> not significantly affect the inert nature of such solids. The term includes, but is not limited to, <br /> earth, sand, gravel, rock, concrete which has been in a hardened state for at least sixty days, <br /> masonry, asphalt paving fragments and other inert solids. <br /> To assure compliance with DRMS regulations and with Aggregate Industries' environmental <br /> standards, the following general conditions shall apply to the acceptance of inert materials and the <br /> backfilling of inert materials at Aggregate Industries sites: <br /> I. Inert Materials should not be accepted from an unknown site. Entities desiring to bring <br /> inert materials onto any Aggregate Industries site for backfilling must complete and sign an <br /> Aggregate Industries Inert Materials Profile Form. <br /> II. All loads, or at a minimum the initial few loads being delivered, should be at least visually <br /> inspected. <br /> a. If Inert Materials are brought in and there is a suspicion that the material might be <br /> contaminated, such as strong odors of garbage, gasoline or other, the material should <br /> not be accepted and should not be unloaded. <br /> b. If other waste is observed, such as lumber, painted material, more than incidental <br /> amounts of wood, vegetation or debris, the material should not be unloaded. <br /> II. If unloaded, contaminated material will have to be picked up and sent to a landfill or back <br /> to the generator. <br /> a. If the contaminated materials were unloaded, then reloaded to be sent back to the <br /> generator, the generator must be notified. Simply loading the contaminated material <br /> and dumping at the site of generation without notification could be considered illegal <br /> disposal by Aggregate Industries if there has not been an agreement to take the <br /> materials back. <br /> b. Unless contaminated materials are easy to visually identify, soil samples will have to be <br /> taken to document that all contamination is removed and the receiving site is clean. <br /> III. A record of the quantity of material brought in (tons/yards)/number of loads delivered must <br /> be recorded. <br /> IV. Concrete must have been in a hardened state for at least sixty(60) days prior to placing in a <br /> fill area. <br /> V. Asphalt must be placed a minimum of three (3) feet above the groundwater table. <br /> Page 1 of 1 <br />