Laserfiche WebLink
CtT R 0 9 OF RECLAMATION, MINING AND SAFETY <br /> . �\�s�%f 1215.Denver.Colorado 80203 ph(303)866-35�E <br /> JLE/mac Elyso <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEER 09Z019 <br /> File No.: M- 1987-049 Site Tla,ne: Bromley Lakes °'�wo,F, <br /> Adams &4fjj' <br /> County TR# (DRUIS Use onlo <br /> permittee: Ready Mixed Concrete Co 3 3 <br /> �c00 <br /> Operator(If Other than Permittee): b <br /> permittee Representative: <br /> Joe Lamanna N o <br /> Please provide a brief description of the proposed revision: <br /> Install buried electric power line to Cell 3 <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted �+ h <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR. s o <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "tiled for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> ,FR. you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies. the Division must deny the TR unless the <br /> permittee requests additional time, in writing.to provide the required information. <br /> There is no pre-defined format for the submittal of a TR. however. it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested 'FR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tvne Required TR Fee Submitted (mark only one) <br /> 1 I Oc. 1 11. 112 construction ❑ <br /> materials,and 112 quarries $216 <br /> 1 12 hard rock (not DMO) $175 ❑ <br /> I I Od. 112d(1. 2 or 3) $1006 ❑ <br />