Laserfiche WebLink
4 <br /> <br />II. Procedures and Summary of the Review Process <br /> <br />ERMR applied for a partial Phase I, II & III bond release (SL-21) under the Colorado Surface Coal Mining <br />and Reclamation Act following reclamation of the New Horizon Mine. The mine is located in Montrose <br />County, 1.7 miles northwest of the Town of Nucla. The mine area is located in the USGS 7.5 minute <br />Nucla Quadrangle map. <br /> <br />All or portions of the following: <br /> Sec 6 T46N, R15W: W ½ NE ¼; W ½ SW ¼ NE ¼; NW ¼; <br /> N ½ NE ¼ SW ¼; N ½ SE ¼; N ½ SE ¼ SE ¼ <br /> Sec 31 T47N, R15W: SW ¼ <br /> Sec 1 T46N, R16W: N ½ NE ¼ NE ¼; NW ¼ NE ¼; NW ¼ SE ¼ NE ¼; <br /> NE ¼ NW ¼; N ½ SE ¼ NW ¼ <br /> Sec 36 T47N, R16W: SW ¼; SE ¼ <br /> Sec 25 T47N, R16W: SW ¼ <br /> <br />The total permit acreage for the New Horizon Mine area is 637.86 acres. The SL-21 application <br />requests a partial Phase I, II and III bond release on 1.6 acres of the C18 Ditch on the Staats property. <br /> <br />Summary of Bond Releases for the New Horizon Mine <br /> <br />SL-01 approved Phase III release of 55.6 acres (42.2 acres disturbed) from the northeast corner of the <br />Mine 1 permit area. The property was to be used by Montrose County, the landowner, to expand the <br />adjacent landfill. Release was approved on July 5, 1989. <br /> <br />SL-02 granted Phase I, II & III release of 14.2 acres (permitted and disturbed) from Mine 1 for expansion <br />of the Montrose County landfill. Release was approved on October 6, 1993. <br /> <br />SL-03 granted Phase I bond release for 215.5 acres (134.9 acres disturbed) at the New Horizon Mine 1. <br />The release was granted on December 16, 1994. The application also requested Phase II release for <br />portions of Mine 1, but the request was denied due to insufficient revegetation. <br /> <br />SL-04 granted Phase I bond release for 98.6 acres of Mine 1 (the “Rice tract”). Phase I release was also <br />granted for 51.8 acres in the southeastern corner of New Horizon Mine 2. The release was approved on <br />May 6, 1996. <br /> <br />SL-05 granted Phase I bond release for 67.4 acres at Mine 2. The release was approved on January 8, <br />1998. <br /> <br />SL-06 granted Phase I bond release for 43.4 acres at Mine 2. This release was approved on July 23, 1999. <br /> <br />SL-07 granted Phase II & III bond release for 215.5 acres (134.9 acres disturbed) at the New Horizon 1 <br />Mine. The release was approved on December 21, 2001. <br /> <br />SL-08 granted Phase I bond release for 85.64 acres at Mine 2. The bond release was approved on October