My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-09_REVISION - M2012004
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012004
>
2019-04-09_REVISION - M2012004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 9:21:29 AM
Creation date
4/9/2019 2:15:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012004
IBM Index Class Name
REVISION
Doc Date
4/9/2019
Doc Name
Request For Amendment To Permit
From
Superior Oilfield Services
To
DRMS
Type & Sequence
AM1
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit L - Reclamation Costs <br /> The following reclamation cost estimate is based on reclaiming the whole 27 <br /> acres at one time when mining is complete.As stated in the mining plan the shaping and <br /> sloping of the site will be done during the mining process,thus not requiring any cuts or <br /> fills needing to be done.Topsoil will be placed using a 25-30 yard scraper at the designed <br /> depth of 6".The area will then be seeded with the approved seed mix being drilled <br /> and mulched as required.As stated no irrigation or fertilizer is anticipated to be used during <br /> the process.The revegetation cost figure used includes approved ssed mix, mulch, labor, <br /> drilling costs and mobilization from Greeley.A blade will be used to do the final grading <br /> both before and after topsoil placement. <br /> VOLUMES/AREAS <br /> > 27 acres to be reclaimed. <br /> > 21,600 cubic yards of topsoil to be placed at a depth of 6"over the 27 acres. <br /> ESTIMATED UNIT COSTS <br /> > Revegetation including all of the above mentioned items $600.00 per acre <br /> > Topsoil placement with scraper $1.10 per cu yd <br /> > Mobilization from Greeley per trip $450.00 per trip <br /> > Blade per hour $125.00 Per hour <br /> RECLAMATION COSTS <br /> > Topsoil placement-21,600 cu yds @ $1.10/cu yd $23,760.00 <br /> > Revegetation @ $600/acre for 27 acres $16,200.00 <br /> > Secondary revegetation of 9 acres @ $600 per acre $5,400.00 <br /> > Mobilization-four trips from Greeley and return with $1,800.00 <br /> scraper and blade. <br /> > 50 hours blade time. $6,250.00 <br /> SUB-TOTAL $53,410.00 <br /> > Insurance, Bond, Management& Profit $6,409.20 <br /> > Administration Costs $2,670.50 <br /> SUB-TOTAL $9,079.70 <br /> TOTAL $62,489.70 <br /> Recommended Bond Amout $62,500.00 <br /> Current Bond Amount $30,100.00 <br /> Additional Amount Required $32,400.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.