Laserfiche WebLink
TRAPPER MINING INC. RECEIVED <br /> CRAIG, COLORADO <br /> APR 0 4 2019 <br /> HORSE GULCH FILL <br /> MATION <br /> QUARTERLY FILL CERTIFICATION �IVWNINGAWSAISION OF ETY <br /> IVIMIING Atm SAFElY <br /> I, Tonia Marie Perkins, a Licensed Professional Engineer in the State of Colorado, in <br /> accordance with 2CCR407-2, Section 4.09.1(11), have conducted a quarterly inspection of the <br /> Horse Gulch Fill construction. This quarterly inspection was conducted on March 28, 2019. <br /> The fill was inspected for stability, and no appearance of instability, structural weakness, or <br /> other hazardous condition was observed during the inspection. Construction during this quarter <br /> has been under my supervision, and to the best of my knowledge and belief, has been <br /> consistent with the design approved by the Colorado Division of Reclamation, Mining, and <br /> Safety. <br /> \\\\\\\LA0 nLIC//�''�'' <br /> ••.....,Fid <br /> Ca <br /> � . <br /> :° 43864 Z' <br /> Tonia Marie Perkins ;• v,•• <br /> CO PE 43864 %D,c�•. �• <br /> %��s��Q'NtA1`\��\��, <br /> 0 <br /> Date <br />