My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-05_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2019-04-05_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2019 9:44:33 AM
Creation date
4/8/2019 7:06:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
4/5/2019
Doc Name
Adequacy Review - Preliminary
From
DRms
To
Blue Mountain Energy, Inc
Type & Sequence
RN7
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Weight description: User Provided <br />Job Condition Correction Factor Source <br />Operator Skill: 0.900 (AB.AVG.) <br />Material consistency: 1.000 (CAT HB) <br />Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 0.900 (SSD-FC) <br />Push gradient: 1.000 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material Weight: 0.838 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br />Net correction: 0.5634 <br /> <br />Adjusted unit <br />production: 394.38 LCY/hr <br />Adjusted fleet <br />production: 788.76 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.659/LCY <br /> <br />Total job time: 8.23 Hours <br />Total job cost: $4,282 <br /> <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 2640.00 4.00 3.00 7.00 1134 2.399 <br />Haul Time: 2.399 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 2640.00 -4.00 3.00 -1.00 4254 0.652 <br />Return Time: 0.652 minutes <br />Total Truck Cycle Time: 6.751 minutes <br />Loading Tool unit <br />Production <br /> <br />562.50 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />466.88 <br /> <br />LCY/Hour <br />Truck Unit Production <br />224.97 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />186.72 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />3 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 373.44 LCY/Hour <br />Adjusted single truck/loader team production: 373.44 LCY/Hour <br />Adjusted multiple truck/loader team production: 373.44 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 3.75 Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.