Laserfiche WebLink
Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 2000.00 -3.00 3.00 0.00 4254 0.945 <br />Haul Time: 0.945 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 2000.00 3.00 3.00 6.00 2851 0.929 <br />Return Time: 0.929 minutes <br />Total Truck Cycle Time: 5.074 minutes <br />Loading Tool unit <br />Production <br /> <br />715.91 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />594.20 <br /> <br />LCY/Hour <br />Truck Unit Production <br />310.41 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />257.64 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 515.27 LCY/Hour <br />Adjusted single truck/loader team production: 515.27 LCY/Hour <br />Adjusted multiple truck/loader team production: 515.27 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 7.12 Hours <br /> <br />Unit cost: <br /> <br />$0.943 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$3,462 <br /> <br />