Laserfiche WebLink
Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 6800.00 3.00 1.20 4.20 2051 3.582 <br />2 10000.00 -2.00 1.20 -0.80 3893 2.648 <br />Haul Time: 6.230 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 10000.00 2.00 1.20 3.20 4074 2.814 <br />2 6800.00 -3.00 1.20 -1.80 4254 1.648 <br />Return Time: 4.462 minutes <br />Total Truck Cycle Time: 13.892 minutes <br />Loading Tool unit <br />Production <br /> <br />715.91 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />594.20 <br /> <br />LCY/Hour <br />Truck Unit Production <br />113.37 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />94.10 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />6 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />4 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 376.40 LCY/Hour <br />Adjusted single truck/loader team production: 376.40 LCY/Hour <br />Adjusted multiple truck/loader team production: 376.40 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 128.41 Hours <br /> <br />Unit cost: <br /> <br />$2.183 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$105,532 <br /> <br />