Laserfiche WebLink
Job Condition Correction Factor Source <br />Operator Skill: 0.900 (AB.AVG.) <br />Material consistency: 1.000 (CAT HB) <br />Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 0.900 (SSD-FC) <br />Push gradient: 0.666 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material Weight: 0.838 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br />Net correction: 0.3752 <br /> <br />Adjusted unit <br />production: 466.45 LCY/hr <br />Adjusted fleet <br />production: 1865.8 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.558/LCY <br /> <br />Total job time: 1.63 Hours <br />Total job cost: $1,695 <br /> <br />