Laserfiche WebLink
SCRAPER TEAM WORK <br /> <br />Task description: Recontouring the Haul Road/County Road 65 Intersection <br />Site: Deserado Mine Permit Action: RN7 Permit/Job#: C1981018 <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task #: 010 State: Colorado Abbreviation: None <br />Date: 3/5/2019 County: Moffat Filename: 010 <br />User: TNL <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> <br /> Equipment Description <br />-Scraper: Cat 637G <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance –Motor Grader: NA <br />-Water Truck: NA <br /> <br />Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br />%Utilization-machine: 100 NA NA NA NA NA <br />Ownership cost/hour: $155.61 NA NA NA NA NA <br />Operating cost/hour: $166.86 NA NA NA NA NA <br />%Utilization-ripper: NA NA NA NA NA NA <br />Ripper own. cost/hour: NA NA NA NA NA NA <br />Ripper op. cost/hour: NA NA NA NA NA NA <br />Operator cost/hour: $31.05 NA NA NA NA NA <br />Unit Subtotals: $353.51 NA NA NA NA NA <br />Number of Units: 1 0 0 0 0 0 <br />Group Subtotals: Work: $353.51 Support: $0.00 Maint: $0.00 <br />Total work team cost/hour: $353.51 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 3,900 CCY Swell factor: 1.060 <br />Loose volume: 4,134 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br /> Scraper Bowl (volume) Basis: <br />Material weight: 3,250 lbs/LCY Struck Volume: 24.00 LCY <br />Material description: Gravel - Pitrun Heaped Volume: 34.00 LCY <br />Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br />Payload Capacity: 25.11 LCY Adjusted Capacity: 25.11 LCY <br /> <br /> <br /> <br /> <br />Cycle Time: