My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-05_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2019-04-05_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2019 9:44:33 AM
Creation date
4/8/2019 7:06:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
4/5/2019
Doc Name
Adequacy Review - Preliminary
From
DRms
To
Blue Mountain Energy, Inc
Type & Sequence
RN7
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 1.000 (DOZ-OC) <br />Push gradient: 1.000 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material Weight: 0.838 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br />Net correction: 0.5634 <br /> <br />Adjusted unit <br />production: 307.62 LCY/hr <br />Adjusted fleet <br />production: 1230.48 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.845/LCY <br /> <br />Total job time: 145.14 Hours <br />Total job cost: $150,974 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.