Laserfiche WebLink
Exhibit L-Reclamation Costs <br /> The following reclamation costs are based on per acre costs to place overbuden and soil on top of the <br /> clay cover,amend the soil as necessary, apply mulch, and to apply seed. Also included is the cost <br /> to remove the red-mix plant area located to the south of the processing plant. No costs are included <br /> for the processing plant as it will remain in place when mining operations cease,as dicussed in <br /> Exhibit E. <br /> Overburden and Soil Distribution <br /> 3 ft thick x 43,560 ftZ/acre=4,840 yd53/acre <br /> 27Yd3 <br /> 4,840 yds3 x$0.50/yd3=$2,420 per acre <br /> Soil Amendments <br /> organic matter; nitrogen, phosphorus, potassium <br /> $300 per acre <br /> Seeding and Mulching <br /> Seeding and mulching based on Table E-1 <br /> $1,200 per acre <br /> Total Per Acre <br /> $3,920 <br /> Redi-Mix Plant <br /> Concrete Slab Removal =$65,000 <br /> Concrete Block Removal=$1,000 <br /> Stockpile Removal=$1,000 <br /> Seeding of 4 acres=$3,000 <br /> Total Cost=$70,000 <br />