Laserfiche WebLink
-2- <br /> 9. Primary Mine Entrance Location(report in either Latitude/Longitude OR UTM): <br /> Latitude/Longitude: <br /> Example: (N) 390 44' 12.98" <br /> (W) 104° 59' 3.87" <br /> Latitude(N): deg 37 min 45 sec 14 89 (2 decimal places) <br /> Longitude(W): deg 102 min 36 sec 20 11 (2 decimal places) <br /> OR <br /> Example: (N) 39.736910 <br /> (W) -104.98449° <br /> Latitude(N) (5 decimal places) <br /> Longitude(W) (5 decimal places) <br /> OR <br /> Universal Transverse Mercator(UTM) <br /> Example: 201336.3 E NAD27 Zone 13 <br /> 4398351.2 N <br /> UTM Datum(specify NAD27,NAD83 or WGS 84) Zone <br /> Easting <br /> Northing <br /> ]I. Primary Present Land Use(check only one): <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) ❑Forestry(FR) E]Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) a Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 10. Primary Future(Post-mining)Land Use(check only one): <br /> FICropland(CR) n Pastureland(PL) n General Agriculture(GA) <br /> WI Rangeland(RL) El Forestry(FR). n Wildlife Habitat(WL) <br /> FI Residential (RS) -EI Recreation(RC) n Industrial/Commercial (IC) <br /> FIDeveloped Water Resources(WR) <br /> 12. Duration of Proiect: <br /> 12.1 Estimated beginning date of excavation: May 1, 2019 <br /> 12.2 Estimated completion date of excavation: August 1, 2019 <br />