Laserfiche WebLink
60"CHDPE B <br /> PIPE STUB, 414 <br /> FIELD FIT TRANSITION STEEL <br /> 60"DIA.CHDPE LENGTH REDUCER(REF.DWG.415) <br /> 60"X 48"CHDPE <br /> PIPE(NEW) REDUCING TEES <br /> (TYP 2) (E CMP <br /> (EXISTING) <br /> A <br /> 414 <br /> FLOW <br /> 36" DIA.RING AND SPLIT 50"CMP AT TOP IF REQ'D TO NOTES: <br /> CAST IRON COVER FOR MANHOLE 60"CHDPE INSERT TRANSITION SPOOL PIECE. 1. CONSTRUCT PER SPECIFICATION 03300:CAST-IN-PLACE CONCRETE. <br /> PIPE STUB, SEAL ANNULUS W/RAMNECK OR <br /> OTHER APPROVED CAULK. 2. CHAMFER EXPOSED CONCRETE CORNERS t'(NOT SHOWN). <br /> FIELD FIT 3. DAYLIGHT 12 G COPPER HDPE LOCATING WIRE AT MANHOLE,LEAVE.MIN.6' <br /> LENGTH EXPOSED. <br /> CONCRETE ENCASEMENT BLOCK, <br /> FIELD LOCATED BOLLARD, MIN.12"ALL SIDES <br /> (TYP 2)REF.DETAIL DWG.416 <br /> O <br /> 48"CHDPE VENT/OVERFLOW, <br /> EXTEND TO DAYLIGHT o <br /> TRANSITION STRUCTURE <br /> 1 PIAN VIEW <br /> 0 2 4 6 6 <br /> Scale in Feet <br /> 60"DIA.MANHOLE LID W/3'RISER SECTION <br /> 48"DIA.CHDPE CENTER OVER REDUCER TEE. <br /> GROUND PIPE <br /> SURFACE MIN.6" <br /> (APPROX.) GRADE BEAM 46"CHDPE <br /> (TYP 2) 46"DIA.CHDPE 45°ELBOW <br /> VENT/OVERFLOW <br /> PIPE <br /> A 6"COMPACTED GRAVEL FLOW <br /> S UNDER GRADE BEAMS <br /> vvuvuuuvuvuuvuuvuu <br /> #5 REBAR, <br /> y NOTE: MATCH 48"CHDPE 16"O.C.E.W.E.F. <br /> — — PIPE BEDDING NOT PIPE INVERT TO <br /> S _ SHOWN. TOP OF 60"CHDPE _ _ <br /> PIPE <br /> OVERLAP REBAR <br /> FLOW 50"CMP INVERT 24"MIN. <br /> 11030.6'(APPROX. ROTATE 60"X <br /> 48"REDUCING <br /> 2 TEE 45° <br /> NOTE: CONCRETE <br /> 1'- <br /> 60"X 48"CHDPE 0" ENCASEMENT <br /> g PIPE BEDDING NOT BLOCK <br /> REDUCING TEE(TYP 2) —I— <br /> SHOWN. T <br /> c <br /> 6"GRAVEL BED, <br /> NOTE: I �� COMPACT W/4 PASSES <br /> TRANSITION STRUCTURE p 50"CMP INVERT ELEV.IS TRANSITION STRUCTURE f e \ VIBRATORY PLATE COMPACTOR <br /> sEcrTON ala APPROX MATE. SET 60" SECTION ala <br /> CHDPE INVERT AT <br /> 0 2 4 6 e EXISTING 50"CMP INVERT. 0 2 4 6 s <br /> Scale in Feet Scale in Feet <br /> 6 <br /> 'This drawing together with any and all additions, In Climax Molybdenum Climax Mine <br /> axm,e reM ssueovoaeio corrections, changes and alterations thereof is the ClimaxMolybdenum INTERCEPTOR REHABILITATION PROJECT Climax,Co <br /> g Z 0 property of Climax Molybdenum Company and is p • <br /> p 0 furnished on the express condition that it shall LaA Freeport-McMoRan Company WEST INTERCEPTOR CULVERT REPLACEMENT PHASE D �� 911/16 <br /> B to not be reproduced, copied, lent or disposed of i ( ) DM As Noted <br /> j 0 directly or indirectly, nor used for any other w 370o s.lrvcw sTeeeT DRAWING NO. <br /> 'g W A purpose than for which it is specifically furnished w W.W.WHEELER ENOLEWoaD,a❑ BO1 10-3405 TRANSITION STRUCTURE $MM 12/1/16 <br /> s without the prior W/iffBn COIISBnf Of said CIImOX Lu 6 ABBC CIATE B, INC 303-761-413C <br /> K 0 Molybdenum Company.' W,",B",",,,,., .,, rnx 303-761-2802 STRUCTURAL PLANS,SECTIONS,AND DETAILS rccEvrme. 3-520-00414 Q <br />