My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-03-27_INSPECTION - C1981010
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981010
>
2019-03-27_INSPECTION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2019 10:49:51 AM
Creation date
3/28/2019 8:32:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Inspection
Doc Date
3/27/2019
Doc Name
Inspection Report
From
DRMS
To
Trapper Mining Inc
Inspection Date
3/20/2019
Email Name
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 March 2019 C-1981-010/Trapper Mine RAR <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> <br /> Page 6 of 10 <br /> <br /> Photo 4: Middle Flume #3 pond looking south from above appears snow and ice covered although thaw signs are <br />Beginning to be apparent. <br /> <br />o All ponds observed appeared snow and ice covered. <br /> <br />TOPSOIL – RULE 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution <br />4.06.4 <br />o No instability was noted on the observed topsoi l piles and the piles appeared to <br />be marked appropriately. <br />o No rilling or gullying at topsoil piles was apparent at the time of inspection. <br /> <br />USE OF EXPLOSIVES – RULE 4.08 <br />General Requirements 4.08.1; Pre Blasting Survey 4.08.2; Public Notice of Blasting Schedule <br />4.08.3; Surface Blasting Requirements 4.08.4; Records of Blasting for Surface Operations <br />4.08.5; Seismographic Measurements 4.08.6 <br />o A blast was scheduled for the afternoon, however the drilling had not been completed. <br />Therefore, a blast was not conducted or observed that day. <br />o Blasting records were checked and no issues were noted. <br /> <br />BACKFILL and GRADING – RULE 4.14 <br />o Backfilling and grading operations halted in November 2018 and will recommence once <br />snow clears and soil dries out. <br />o Dumping of spoil is taking place in benches and was not being graded at the time of
The URL can be used to link to this page
Your browser does not support the video tag.