Laserfiche WebLink
21 March 2019 C-1981-010/Trapper Mine RAR <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> <br /> Page 6 of 10 <br /> <br /> Photo 4: Middle Flume #3 pond looking south from above appears snow and ice covered although thaw signs are <br />Beginning to be apparent. <br /> <br />o All ponds observed appeared snow and ice covered. <br /> <br />TOPSOIL – RULE 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution <br />4.06.4 <br />o No instability was noted on the observed topsoi l piles and the piles appeared to <br />be marked appropriately. <br />o No rilling or gullying at topsoil piles was apparent at the time of inspection. <br /> <br />USE OF EXPLOSIVES – RULE 4.08 <br />General Requirements 4.08.1; Pre Blasting Survey 4.08.2; Public Notice of Blasting Schedule <br />4.08.3; Surface Blasting Requirements 4.08.4; Records of Blasting for Surface Operations <br />4.08.5; Seismographic Measurements 4.08.6 <br />o A blast was scheduled for the afternoon, however the drilling had not been completed. <br />Therefore, a blast was not conducted or observed that day. <br />o Blasting records were checked and no issues were noted. <br /> <br />BACKFILL and GRADING – RULE 4.14 <br />o Backfilling and grading operations halted in November 2018 and will recommence once <br />snow clears and soil dries out. <br />o Dumping of spoil is taking place in benches and was not being graded at the time of