Laserfiche WebLink
EXHIBIT C -Mining Plan <br /> Rule 6.3.3 <br /> The purpose of the mining plan is to describe how mining will affect the permit area for the duration of <br /> the operation. <br /> 1) Estimated dates of commencement: AL11 and completion: 2-Vaig <br /> Note: Reclamation of all affected lands shall be completed within 12 months after issuance of the <br /> permit. An Operator possessing a 111(1)(b) Reclamation Permit must convert to the appropriate <br /> regular construction materials permit if extraction and export of materials from the site are not <br /> completed within 12 months after the issuance of the permit. <br /> 2) Depth of topsoil to be salvaged (check one): <br /> _]�4-6 inches 6-8 inches <br /> 8-10 inches 10-12 inches / <br /> Other: Atupt <br /> n N/A, explain: <br /> 3) Description of w topsoil will b stock ' ed and stabiliz <br /> 4) Thickness of overburden needed to be moved: �J `" ;7 '� feet or N/A <br /> 5) Thickness of deposit to be mined: 0 feet <br /> 6) How will the mine be accessed: existing roads (LI) new roads will be created <br /> a. Please describe the existing ro axis: z Z& <br /> b. If there will be new roads or road improvements, please describe the new roads and road <br /> improverss%s, ote, new roads mit be included in permitted acreage): <br /> 7) Will water be needed during the mining operation (check one): Yes or (IM) No <br /> a. If yes, please describe the source of the water and how much water will be used during the <br /> operation: A / <br />