Laserfiche WebLink
-2 - <br /> 9. Primary Mine Entrance Location(report in either Latitude/Longitude OR UTM): <br /> Latitude/Longitude: <br /> Example: (N) 390 44' 12.98" <br /> (W) 104° 59' 3.87" <br /> Latitude(N): deg min sec (2 decimal places) <br /> Longitude(W): deg min sec (2 decimal places) <br /> OR <br /> Example: (N) 39.736910 <br /> (W) -104.98449° <br /> 7OW(5Latitude(N) decimal places) <br /> Longitude(W) —.3 (5 decimal places) <br /> OR <br /> Universal Transverse Mercator(UTM) <br /> Example: 201336.3 E NAD27 Zone 13 <br /> 4398351.2 N <br /> UTM Datum(specify NAD27,NAD83 or WGS 84) Zone <br /> Easting <br /> Northing <br /> 11. Primary Present Land Use check only one): <br /> Cropland(CR) ®Pastureland(PL) General Agriculture(GA) <br /> ❑Rangeland(RL) ❑Forestry(FR) a Wildlife Habitat(WL) <br /> Residential(RS) MRecreation(RC) Q Industrial/Commercial(IC) <br /> ®Developed Water Resources(WR) <br /> 10. Primary Future(Post-mining)Land Use(check only one): <br /> FI Cropland(CR) Pastureland(PL) II General Agriculture(GA) <br /> FI Rangeland(RL) Forestry(FR) F-1 Wildlife Habitat(WL) <br /> LI Residential(RS) F]Recreation(RC) II Industrial/Commercial(IC) <br /> F]Developed Water Resources(WR) <br /> 12. Duration of Proiect: <br /> 12.1 Estimated beginning date of excavation: ��5? <br /> �j 12.2 Estimated completion date of excavation: ;,fJ- 0 <br />