JOURNEY VENTURES LLC W
<br /> Journey Ventures Pit
<br /> � �o-
<br /> Slurry Wall mLLN
<br /> a o g
<br /> 0 02
<br /> LOCATED IN Z
<br /> TOWNSHIP 5 NORTH, RANGE 64 WEST, 6th P.M. O
<br /> G�
<br /> COUNTY of WELD, STATE of COLORADO vH
<br /> GENERAL NOTES: OCTOBER, 2015 Q =
<br /> 1. THESE CONSTRUCTION PLANS ARE TO BE USED IN CONJUNCTION WITH THE TECHNICAL SPECIFICATIONS PREPARED BY SHEET INDEX
<br /> J&T CONSULTING, INC., AND GEOTECHNICAL INVESTIGATION AND ENGINEERING DESIGN RECOMMENDATIONS PREPARED BY N
<br /> CESARE. INC. 1 Cover Sheet d
<br /> i
<br /> 2. COMPLY WITH ALL REQUIREMENTS OF OWNER OBTAINED PROJECT PERMITS: INCLUDING, BUT NOT LIMITED TO, PERMITS 2 Soil Borings Location Map 3
<br /> FROM THE U.S. ARMY CORPS OF ENGINEERS AND COLORADO DEPARTMENT OF HEALTH AND ENVIRONMENT. CONTRACTOR )
<br /> SHALL OBTAIN ALL OTHER PERMITS NECESSARY FOR CONSTRUCTION OF THE WORK. 3 Geotechnical Bore Log Information
<br /> 3. PROTECT ALL EXISTING WETLANDS. 4 Slurry Wall Horizontal Control Plan
<br /> 4. THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTING AND MAINTAINING EROSION AND SEDIMENT CONTROL MEASURES 5.9 Slurry Wall Plan and Profiles d = v
<br /> AT ALL TIMES DURING CONSTRUCTION. H
<br /> 5. ALL CONSTRUCTION ACTIVITIES MUST COMPLY WITH THE STATE OF COLORADO PERMITTING PROCESS FOR "STORM WATER SITE 3
<br /> DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY." FOR INFORMATION, PLEASE CONTACT THE COLORADO
<br /> DEPARTMENT OF HEALTH, WATER QUALITY CONTROL DIVISION, 4300 CHERRY DRIVE SOUTH, DENVER, COLORADO 0
<br /> 80246-1530. ATTENTION: PERMITS SECTION. PHONE 303-692-3500.
<br /> 6. IF DEWATERING IS REQUIRED, A STATE CONSTRUCTION DEWATERING DISCHARGE PERMIT IS REQUIRED FOR DISCHARGES
<br /> TO A STORM SEWER, CHANNEL, IRRIGATION DITCH, ANY STREET THAT IS TRIBUTARY TO THE AFOREMENTIONED FACILITIES,
<br /> OR ANY WATER OF THE UNITED STATES. - WCR 58
<br /> 7. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR SHALL CONTACT ALL UTILITIES TO COORDINATE LEGEND: J
<br /> SCHEDULES. - PROPERTY LINE j
<br /> B. THE CONTRACTOR SHALL REGULARLY PATROL THE PUBLIC LANDS ADJACENT TO THE PROJECT, REMOVE CONSTRUCTION In $,' - -- - SECTION LINE
<br /> DEBRIS AND KEEP AREAS CLEAN AND SAFE. >E- FENCE LINE H
<br /> � 0E—— OVERHEAD ELECTRIC LINES �
<br /> 9. THE CONTRACTOR IS RESPONSIBLE FOR DEVELOPING AND IMPLEMENTING A SEQUENCE AND SCHEDULE FOR COMPLETION Ln N —T—— EXISTING TELECOM LINE _
<br /> OF THE WORK IN ACCORDANCE WITH APPLICABLE PROVISIONS OF THE CONTRACT DOCUMENTS. ,cc cc ,�i —G—— EXISTING GAS LINE
<br /> 10.READ THOROUGHLY AND BECOME FAMILIAR WITH THE SPECIFICATIONS AND INSTALLATION DETAILS FOR THIS RELATED V V —w—— EXISTING WATER LINE _
<br /> WORK PRIOR TO CONSTRUCTION. 3 3 3 —Fo—— EXISTING FIBER OPTIC 4)
<br /> 11.VERIFY SITE ELEVATIONS PRIOR TO CONSTRUCTION. ? MINING LIMIT �
<br /> d -------------DIRT ROAD
<br /> ca 12. THE CONTRACTOR SWILL PROCURE ALL PERMITS AND LICENSES, PAY ALL CHARGES AND FEES INCLUDING, BUT NOT
<br /> In — —-�89--0--——EXISTING CONTOURS C
<br /> LIMITED TO, ALL INSPECTION CHARGES OF AGENCIES WAVING APPROPRIATE JURISDICTION. -_-- --�---- i
<br /> PROPOSED CONTOURS =
<br /> N 13.CONTRACTOR SHALL PROVIDE AS-BUILT DRAWINGS OF ENTIRE PROJECT, AS SPECIFIED, UPON FINAL COMPLETION OF - . —PERMIT BOUNDARY 0
<br /> PROJECT.
<br /> 7
<br /> N ,- ® ELECTRIC RISER BOX
<br /> rn F GUY WIRE
<br /> OD SEDIMENT AND EROSION CONTROL: - 0 POWER POLE
<br /> 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SEDIMENT AND EROSION CONTROL AT THE SITE THROUGHOUT - BORING LOCATION
<br /> UCONSTRUCTION. ... / / // / WETLAND BOUNDARY
<br /> 2. BEST MANAGEMENT PRACTICES (BMP'S) SHALL BE USED AS NECESSARY TO ADDRESS SEDIMENT AND DUST FROM SITE
<br /> DISTURBANCE. ADDITIONAL MEASURES MAY BE REQUIRED AT THE DIRECTION OF THE ENGINEER. RIGHT-OF-WAY /\J
<br /> 3. BMP'S MAY INCLUDE, BUT ARE NOT LIMITED TO: - HWY 34 �+ j 0 o
<br /> KERSIrY S
<br /> MINIMAL DISTURBANCE FOR MINIMAL TIME PERIODS -
<br /> GRAVEL CONSTRUCTION ENTRIES K
<br /> a) SILT FENCE, STRAW BALE OR SAND BAG BARRIERS, ROCK CHECK DAMS i s00 0 1— VICINITY MAP
<br /> 'o STORM SEWER INLET PROTECTION
<br /> U SEDIMENT CAPTURE PONDS SCALE 1" = 1000
<br /> 2 SITE WATERING FOR DUST SUPPRESSION SCALE IN FEET D
<br /> w G In
<br /> N 4. BMP'S SHALL BE MAINTAINED AND KEPT IN GOOD REPAIR FOR THE DURATION OF THE PROJECT. THE CONTRACTOR SHALL �w G m �S 3
<br /> > INSPECT BMP'S WEEKLY AND AFTER SIGNIFICANT (GREATER THAN 0.1" PRECIPITATION) STORM EVENTS. THE MAINTENANCE Va,
<br /> AND REPAIR SHALL BE COMPLETED IN A TIMELY MANNER. SEDIMENT AND DEBRIS SHALL BE REMOVED WHEN THEY REACH -
<br /> 7 HALF THE BMP HEIGHT OR IMPACT THE FUNCTION OF THE BMP. OWNER SURVEYOR o1(J
<br /> +N- American West Land Surveying Co.Journey Ventures, LLC
<br /> 5. SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING AND P.O. Box 129 331 South 4th Avenue �„ z
<br /> PERIMETER SILT FENCING. SOILS THAT WILL BE STOCKPILED FOR MORE THAN 30 DAYS SHALL BE MULCHED AND SEEDED Greeley, CO 80632 P.O. Box 129
<br /> N WITH A GRASS COVER WITHIN 14 DAYS OF STOCKPILE CONSTRUCTION. Brighton, CO 80601
<br /> 303-659-1532
<br /> CU d 6 THE ARE PROPERLY
<br /> TOR SHALL
<br /> LLANSURE THATERED AL PREVENT LOSS LOSS DURING TRANSPORT.
<br /> IMPORTED TO OR EXPORTED FROM THE SITE
<br /> 7. THE CONTRACTOR SHALL REMOVE ALL SEDIMENT, MUD, AND CONSTRUCTION DEBRIS RESULTING FROM THIS PROJECT ENGINEER GEOTECHNICAL/SOIL
<br /> FROM FLOWUNES AND PAVEMENT OF PUBLIC STREETS IN A TIMELY MANNER. J&T Consulting, Inc. INVESTIGATIONS
<br /> J.C. York
<br /> 6. SOILS EXPOSED DURING LAND DISTURBING ACTIVITY SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR 305 Denver Ave., Ste. D Cesam, Inc.
<br /> a DISCING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION OR OTHER PERMANENT EROSION CONTROL IS IN PLACE. NO Fort Lupton, CO 80621 7108 S Alton Way, Bldg. B
<br /> SOILS SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED 303-857-6222 Centennial, CO 80112 TEMPORARY OR PERMANENT EROSION CONTROL IS INSTALLED UNLESS OTHERWISE APPROVED. Fax: 303-857-6224 303-220-0300 Engineersr Certification
<br /> N Job# 07113
<br /> 9. ALL TEMPORARY SEDIMENT CONTROLS WILL BE REMOVED WITHIN 30 DAYS AFTER THE FINAL STABILIZATION IS ACHIEVED I hereby certify that these plans for the construction of the Journey
<br /> CD Di1e 10/9115
<br /> OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, WHICHEVER OCCURS FIRST. Ventures Pit Slurry Wall were prepared by me or under my direct supervision
<br /> for Journey Ventures, LLC. aswn eY WSS
<br /> 10.NATURAL VEGETATION SHALL BE RETAINED AND PROTECTED WHENEVER POSSIBLE. EXPOSURE OF SOIL TO EROSION BY oewma ev 7Pv
<br /> Y Re,Cho JT-Cover sheet REMOVAL OR DISTURBANCE OF VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION ev JCY
<br /> r> OPERATIONS AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. f Fik
<br /> KIIOW Vtlt13Y5 belolnL Sak As Shown
<br /> 'al befota you dig,
<br /> o Sheet: or:
<br /> James C. York, P.E.
<br /> L Colorado Registration No. 36846
<br /> 9