My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-03-27_REVISION - M2008080 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008080
>
2019-03-27_REVISION - M2008080 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:21:10 PM
Creation date
3/27/2019 2:12:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008080
IBM Index Class Name
Revision
Doc Date
3/27/2019
Doc Name
Request for Technical Revision
From
Journey Ventures, LLC
To
DRMS
Type & Sequence
TR4
Email Name
PSH
MAC
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
zoo ioo 0 200 400 soo <br />SCALE IN FEET <br />4 <br />PERMIT <br />BOUNDARY <br />EXISTING <br />GROUND <br />* DISTANCE VARIES <br />BACKFILL EXISTING <br />TRENCH WITH NATIVE <br />MATERIALS <br />1.5' TYP. SANDY CLAY . . . . . . <br />OVERBURDEN <br />VARIES . . ASTM. C33-7@ " <br />CONCRETE, . . . . . . . . . <br />AGGREGATE . . . . . . . . <br />. . . . . . . .. .a. a •r ,s. •..ate . . . . . .. <br />d. <br />�.. d +4` ; <br />' d (MIN) . . . . . . . . . . . . . . . <br />ASTM C33 a d <br />CONCRETE SAND d <br />dd <br />(IF REQUIRE) VAtIES d <br />• 4. <br />A 'd 4.0' <br />. . <br />SAND AND GRAVEL <br />Cd <br />a s ® d ALLUVIUM <br />r. .. ad - . .o:�*' a, .05'% r <br />TYP. <br />TYP. C ).'A. _ _ .. (TYP.) : <br />d . <br />3' <br />4' <br />PERIMETER DRAIN DETAIL (TYPICAL SECTION IF REQUIRED <br />N.T.S. <br />PERIMETER DRAIN <br />LOCATION <br />(IF REQUIRED) <br />OUTLET <br />FACILITY <br />12.5' OVERBURDEN AND TOPSOIL <br />BACKFILL ALL DISTURBED AREAS <br />DOWN TO WATER SURFACEF VARIES <br />... ... ... = 4591 <br />SLURRY WALL <br />" SAND AND GRAVEol <br />L : � . -.-: • _: ' _ 31 <br />S�0pF <br />110, <br />loo <br />X0 //,B�DkOCK/ <br />/3 4* <br />00 <br />10 X0, <br />TYPICAL BACKFILL SECTION <br />N.T.S. <br />SLURRY WALL NOTES0 <br />: <br />1. Bentonite Specifications <br />YP/PV ratio API Std. 13A less than 3 <br />Viscometer greater than 30 <br />Filtrate Loss less than 15 cm3 <br />Moisture Content ASTM D 2216 less than 10 percent <br />Test results for each lot of bentonite must be provided. <br />2. Water Specifications <br />pH 6-8 <br />Hardness less than 200 ppm <br />Total Dissolved Solids less than 500ppm <br />Oil, organics, acids, alkali less than 50 ppm each <br />Chloride report <br />3.. Bentonite Slurry General Specifications <br />The initial bentonite slurry must be tested prior to placement in <br />the trench. The slurry may be mixed in high shear mixers or <br />mixed and hydrated in slurry hydration ponds. In general, a <br />minimum hydration time of 8 hours will allow the bentonite slurry <br />to meet all criteria. A minimum bentonite content of 6 percent in <br />the slurry by weight is required. <br />4. Bentonite Slurry T,� esting Specifications before Placement <br />Viscosity Measured w/ Marsh Funnel (API RP 1313-1) less <br />than 40 sec <br />Density less than 64 pcf <br />Filtrate Loss less than 20 cm3 <br />pH 6.5 to 10 <br />The tests listed above should be run 1 or 2 times per shift and <br />at least once per batch of slurry. The slurry must be further <br />tested after placement in the trench. The tests conducted are for <br />viscosity, density, sand content, and pH. Two sets of tests per <br />shift at two locations in the trench (approximately 2 feet below <br />the slurry surface and 2 feet above the bottom of the trench) <br />are required. If the density of the slurry in the trench exceeds 85 <br />pcf the excess solids must be removed by desanding or the slurry <br />replaced with fresh slurry. The slurry level must be maintained at <br />least 3 feet above the ground water elevation and no more than <br />2 feet below the top of the working platform. <br />5. Bentonite Slurry Testing. Specifications after Placement <br />Unit Weight 1.03 to 1.40 gm/cm3 <br />Sand Content ASTM D 4381-84(1993)e10 to 20 percent by <br />volume <br />3YA <br />AEGEND0, <br />RECEIVED <br />X UTILITY Pow <br />MAR 2 7 2019 <br />} GUY WIRE <br />G DMSION OF RECLAMATION <br />GAS LINE MARKER MINNGANDSAFETY <br />GAS VALVE <br />WELL <br />WATER METER <br />WATER FAUCET <br />W <br />WATER LINE MARKER <br />®► ELECTRIC TRANSFORMER <br />• TREE <br />TELEPHONE PEDESTAL <br />T <br />4 TELEPHONE LINE MARKER <br />PROPERTY LINE <br />FENCE LINE <br />—GE aE OVERHEAD ELECTRIC LINE <br />EXISTING DUKE GAS <br />am <br />Or UNDERGROUND WATER LINE <br />�. ® e — �` EXISTING CONTOURS (2' INTERVALS) <br />GRAVEL ROAD <br />��� ■� ��� PROPOSED PERMIT BOUNDARY <br />SLURRY WALL <br />4fi40 PROPOSED CONTOURS <br />10' 25' <br />OFFSET <br />SLURRY WALL <br />PERIMETER DRAIN <br />DITCH <br />BOTTOM OF DITCH <br />BANK SLOPE <br />SOUTH BRANCH PLUMB DITCH <br />OFFSET DETAIL <br />N.T.S. <br />6. Soil—Bentonite Backfill Specifications <br />S—B backfill slump ASTM C 143 1 set per 100 cu. yds. <br />Slump 2-6 inches <br />S—B backfill gradation 1 set per 300 cu. yds. <br />Screen (US Standard) Percent by Dry Weight <br />3 inch 100 <br /># 4 40-80 <br />#40 25-60 <br />#200 20-40 <br />Minimum Plasticity Index of 10 <br />7. Key Trench and Slurry Wall Cap Specifications <br />During excavation, soundings should be obtained to determine the <br />elevations of the top of the key layer, the bottom of the <br />excavation, and the bottom of the trench prior to backfilling. If <br />sediments in excess of 2 inches have accumulated it is necessary <br />to clean the trench bottom by airlift pumps or excavation <br />equipment to remove the sand and sediment that has settled. The <br />trench bottom should be cleaned, as a minimum, at the beginning <br />of each shift. Soundings should be obtained approximately every <br />20 feet. <br />Adequate keying in the S—B backfill to an impermeable layer at <br />the base of the wall will be required and specified in the final <br />design report for the slurry wall. The design documents will include <br />a description of the key in layer and describe how trench cuttings <br />or other observations will be used to assure that the slurry wall <br />will be adequately keyed. Temporary slurry wall protection will be <br />required in the form of a noncompacted soil cover placed within <br />one day over each backfilled 100 foot reach. The temporary cover <br />is removed after settlement (approximately 2 weeks) and replaced <br />with a compacted clay cover over the completed slurry wall. <br />8. PostConstruction Testing <br />Post construction testing will be conducted in accordance with the <br />"Colorado State Engineer's Office." <br />9. Above specifications (notes 1-8) are provided as a general <br />guideline for permitting purposes. Final specifications and design <br />criteria will be developed during the final design of the slurry wall. <br />n <br />■M <br />X <br />la <br />N� <br />'N o <br />N <br />opo o <br />a) M <br />0 X c' <br />a LL <br />> L e <br /><C 2 Lo a <br />U <br />0Co� <br />c. <br />E ' <br />` 1 <br />�J`j• <br />C5 <br />J`3 0 <br />m <br />C) <br />n- <br />0- cu <br />az <br />a - <br />O <br />c[i <br />E <br />Cz <br />U <br />(U <br />it <br />0 <br />co <br />0 <br />cc0 <br />0 <br />N <br />J&T Consulting, Inc. <br />C. <br />Job # <br />07113 <br />Date <br />9/15/08 <br />Drawn By <br />WSS <br />Designed By <br />TPY <br />Checked By <br />JCY <br />File <br />JT -Reclamation <br />Scale <br />1" = 200'11 <br />Sheet: or: <br />1 , <br />
The URL can be used to link to this page
Your browser does not support the video tag.