My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-03-22_PERMIT FILE - C1982056A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056
>
2019-03-22_PERMIT FILE - C1982056A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 9:33:56 AM
Creation date
3/27/2019 9:16:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
3/22/2019
Doc Name
Pages 2.05-65 to 2.05-197.3 part 2
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Twentymile Mine railroad spur. The 6RT Thickener Underflow Borehole extends approximately 540 feet from the <br /> surface into the sealed EMD mine workings. An existing light-use road extends approximately 250 feet from RCR33 <br /> to this location. The 7RT Thickener Underflow Borehole installation will be located east of both the intersection of <br /> Routt County Roads 27 (RCR27) and 33 (RCR33) and the 6RT Borehole, on the north side of Foidel Creek and the <br /> Twentymile Mine railroad spur. The 7RT Thickener Underflow Borehole will extend approximately 850 feet from the <br /> surface into the sealed EMD mine workings. The 2MN Thickener Underflow Borehole installation will be located near <br /> the north edge of the existing Mine Facilities Area,between the existing Weld Shop and the Twentymile Railroad Spur <br /> and will be accessed by a short (550 feet) access road from the existing mine road. The 2MN Thickener Underflow <br /> Borehole will extend approximately 150 feet from the surface into the existing active 2MN No. 6 Mine Entry. From <br /> this location, the coal slurry will be piped underground approximately 2,650 feet and 3,850 feet, respectively, to <br /> horizontal boreholes into the sealed 7-Right and 8-Right Panels in the Eastern Mining District(EMD). <br /> An additional thickener underflow borehole was added in the WMD in 2017. The 12-Left Thickener Underflow <br /> Borehole is located off RCR27 just east of the intersection with County Road 37 on the north side of the road. The <br /> borehole will extend into the WMD mine workings approximately 1,260 feet in the 12 Left Irby Panel. In 2018 four <br /> additional borehole locations were proposed and permitted in the WMD in panels 14, 15, 16,and 17.All four locations <br /> are along County Road 27 with 14-Left and 15-Left on the East side and 16-Left and 17-Left on the west side, all are <br /> within 700 feet of County Road 27. All boreholes will be drilled into the inby panel of their associated panel,the depths <br /> are 1,370 feet, 1381 feet, 1408 feet,and 1405 feet respectively. <br /> Three additional thickener underflow boreholes will be added in the SWMD in 2016 and 2017. The SWMD Thickener <br /> Underflow Borehole will be located near the Fish Creek Borehole road where it joins RCR27. Two alternate borehole <br /> locations have been identified, only one of which will be initially constructed and developed. The first location 1 (in <br /> Panel 2SW) is located on the west side of RCR27 between the west mine entrance and the Fish Creek Borehole road, <br /> and has been selected for construction. The second location(in Panel 1 SW) is located on the east side of RCR27 and <br /> will be accessed from the Fish Creek Borehole road this location was an alternative and will not be constructed at this <br /> time but may be a potential site in the future.The SWMD Thickener Underflow Borehole in 2SW will extend from the <br /> surface into the sealed SWMD mine workings a maximum of approximately 750 feet. TC also plans a test borehole <br /> (Sandstone Sub Test Borehole) to evaluate conditions in the 3SW Gateroad (WMD) for a future thickener underflow <br /> borehole. The test hole will be located on the existing Sandstone Substation pad, and will be directionally drilled to <br /> intersect the 3SW Gateroad at a depth of approximately 420-feet. If conditions in this area are favorable,TC will convert <br /> the test borehole to a thickener underflow borehole, which will involve boring the test hole out to 22 to 24 inches for <br /> the surface casing and 12 to 15 inches for the finished borehole, setting and cementing a 16 to 18 inch surface casing <br /> to a depth of approximately 60 feet, setting and cementing a 8 to 11 inch borehole casing to a depth of approximately <br /> 420 feet, and setting an 8-foot covered CMP manhole with lightening protection in-place to protect the well-head. <br /> The third borehole will extend approximately 1,060 feet into the 1 SW Panel, at a location north of the sandstone cliffs <br /> adjacent to the Twentymile Facilities in the SWMD. This borehole will be accessed from the existing ranch road which <br /> is used to access the Union Cellular tower from the Fish Creek Road. Minor road improvements to provide for year- <br /> round access will include limited grading, placement of water-bars and minor work on the existing ditches, and <br /> placement of gravel surfacing materials. <br /> In order for the thickener underflow to reach the 1 SW and the 12, 14, 15, 16, & 17-Left thickener underflow boreholes, <br /> a pump boost station was installed at the 2SW borehole pad location. The pump boost station will consist of a one- <br /> foot thick, 20 x 20 foot concrete pad, a pre-fabricated pump building,the booster pump and piping connections, and <br /> a drop-line from a nearby power-pole with electrical connections and pump controls. In 2019 a 10' X 18' pre- <br /> fabricated master control building,an additional transformer,and an 18'X 32'addition to the pump building to house <br /> an additional pump system will be added to the pump station to assist in the pumping operations of the larger <br /> additional pipeline network. <br /> At each of these locations (except the Sandstone Sub location, where a pad already exists), a drill-pad and required <br /> drainage structures were or will be constructed. Buried thickener underflow pipelines have been or will be installed <br /> between the existing washplant facilities and the thickener underflow boreholes. The locations of the thickener <br /> underflow boreholes and the associated pipelines are shown on the Surface Facilities and Freshwater Systems Map, <br /> Map 24(1/4). Design information for the thickener underflow boreholes and pipelines is provided in Exhibits 49K and <br /> 49S.Installation of the thickener underflow boreholes generally involves placement of construction erosion controls <br /> (silt fence and/or straw wattles), removal and windrowing of available soil materials from pad areas and the road <br /> margins,construction of designed drainage structures(ditches and rock sumps), grading to establish level drill-pads <br /> MR19-312 2.05-84.6 03/11/19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.