Laserfiche WebLink
• ASPHALT <br /> SPECIALTIES CO. <br /> Chavers Mining Resource—Permit No. M-2015-030 March 18,2019 <br /> Technical Revision No. 2(TR-02) Page 2 <br /> A copy of the revised Exhibit C-2—Mine Plan Map is provided in Attachment A. Screenshots of the <br /> Colorado Oil and Gas Conservation Commission (COGCC) Geographic Information System (GIS) <br /> Online Mapping database with P&A details for the two (2) wells is provided in Attachment B. <br /> 6.4.4. EXHIBIT D—MINING PLAN <br /> (e) Approximate Mining Timetable <br /> Mining and backfill of Cell 1 is complete. Currently, the southeastern corner of Cell 3 is being <br /> mined and backfilled with operations moving to the west and southwest. It is anticipated that Cell 3 <br /> will then be mined towards the north as depicted on Exhibit C-2 —Mine Plan Map in Attachment A. <br /> Mining will then begin in Cell 2 with operations moving from the west to the east. Mining will then <br /> move south to the northeastern corner of Cell 3. An approximate mining timetable is given in Table <br /> 6.4.4-2. However, as aggregate mining and processing is entirely dependent on market conditions, <br /> the mining timetable is an estimated schedule. <br /> Table 6.4.4-2: Mining Timetable <br /> Mining Cell Size of Mining Cell Approximate Time Until Complete <br /> Cell 1 4 acres Complete <br /> Cell 2 8 acres 4—5 Years <br /> 3—4 Years(Western Half) <br /> Cell 3 32 acres - ---- - - <br /> 5—6 Years(Northeast Corner) <br /> Cell 4 23 acres 6— 8 Years <br /> Cell 5 4 acres 8—9 Years <br /> Cell 6 4 acres 8—9 Years <br /> Total 75 acres 8—9 Years <br /> Attachments: <br /> Attachment A Exhibit C-2—Mine Plan Map <br /> Attachment B COGCC GIS Online Map Screenshots <br /> cc: <br /> ASCI File <br />