Laserfiche WebLink
of co <br /> COLORADa R02 - <br /> LAMATION, MINING AND SAFETY <br /> ** �� 1313 SherT er,Colorado 80203 ph(303)866-3567 <br /> •,ens• RECEIVED <br /> ECG <br /> REQUEST FOR TECHNICAL REVISION JR) COVER SHEET MAR 2 6 2019 <br /> File No.: M- 2015-030 site Name:Chavers Mining Resource of—wrw,pc T" <br /> WETY <br /> County Weld TR# ORMS Use only) <br /> Permittee: Specialties Co., Inc. NM0 3 <br /> o -a NO <br /> Operator(If Other than Permittee): 9- Ln <br /> Greg Geras = b <br /> Permittee Representative: y p <br /> Please provide a brief description of the proposed revision: <br /> Update of 6.4.3 Exhibit C-2 - Mine Plan Map and 6.4.4 Mine Plan to reflect current conditions. <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> J <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or m < .,,i <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted �m <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, 0 <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "tiled for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 1 1 Oc, 11 1, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> I l Od, 1 12d(1, 2 or 3) $1006 ❑ <br />