Laserfiche WebLink
of Coco <br /> *� $ COLORi ECLAMATION, MINING AND S� c <br /> 1,1_ TR03 .-nver,Colorado 80203 ph(303)866-3567 RECEIVED TC1/mac AR 2 6 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET Z019 <br /> �MoN OF RECLAMgnO,N <br /> File No.: M- 1988-018 Site Name: Midway Pit MINING AND SA . <br /> County EI Paso TR# (DRMS Use onlj <br /> Permittee: Midway Aggregates, RLLP <br /> w <br /> 00 3 Operator(If Other than Permittee): Midway Aggregates, RLLP o a <br /> a pp <br /> Permittee Representative:Taryn Tigges, Telesto Solutions ttigges@telesto-solutions.com f co <br /> s <br /> 00 <br /> Please provide a brief description of the proposed revision: <br /> Response to Inspection of 10/2/2018 (2019-01-23INSPECTION - M1988018). Includes_ <br /> olive trees on site. <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted y o <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, y �I;U <br /> the Division may require the submittal of a permit amendment to make the required or desired changes ° (Z.) <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tyne Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />