My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-03-22_REVISION - C1982056 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2019-03-22_REVISION - C1982056 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2019 9:19:16 AM
Creation date
3/25/2019 8:26:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
3/22/2019
Doc Name
Adequacy Review Response
From
Peabody, Twentymile Coal, LLC
To
DRMS
Type & Sequence
TR93
Email Name
TNL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDITIONAL THICKENER TANK SYSTEM INSTALLATION <br />RECLAMATION COST ESTIMATE R19-93 <br />Modified Cost Estimate From TR18-91 <br />Facilities Demolition and Removal <br />Building Demolition <br />Remove Mechanical Equipment (Thickener Equipment) — %z day @ $1,650/day 830 <br />Thickener Tank 90 Ft Dia X 14 ft — 89,000 cf x $0.13/cf 11,570 <br />Pump Building 30 ft x 40 ft x 20 ft — 24,000 cf x $0.13/cf 3,120 <br />Subtotal $15,520 <br />Foundations <br />Pump Building Pad -.. 40 ft X 50ft X 0.5ft — 1000 cf x $8.55/cf <br />Concrete Pad 90 ft Dia X 1.0' thick — 6360 cf x $8.55/cf <br />Concrete Pad (Clarified Water Tank) 15' Dia X 1' = 177 cf x $8.55/cf <br />Concrete Pad (De -Aerator Tank) - � 10'X 10'X I'-- 100cf x $8.55/cf <br />Subtotal <br />Back -filling, and RellradinS <br />Included in Facilities area reclamation costs <br />Topsoil Replacement and Revegetation <br />Included in Facilities area reclamation costs <br />Subtotal — All Direct Costs <br />Indirect and Administrative Costs (& 8%) <br />Total Estimated Reclamation Cost <br />8,550 <br />54,365 <br />1,513 <br />855 <br />$65,283 <br />$ 80,803 <br />6,465 <br />$ 87,268 <br />Notes: Costs from Means Site Work and Landscape Cost Data and recent bond calculations <br />TR 19-93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.