March 21, 2019 <br />Ms. Tabetha Lynch, Environmental Protection Specialist <br />Division of Reclamation, Mining, and Safety <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />(303) 866-3567 X 8147 <br />TwenVmile_Coal,_LLC <br />Foidel Creels Mine <br />29515 RCR 27 <br />Oak Creek, CO 80467 <br />970.879.3800 <br />RE: Twentymile Coal, LLC - Foidel Creek Mine (Permit No. C-82-056), Technical Revision (TR19-93) <br />Wash Plant Additional Thickener Tank System Design Modification, Adequacy Response <br />Dear Ms. Lynch: <br />Below you will find responses to the adequacy review items that were noted in the adequacy review dated March <br />12, 2019 <br />• Item #1: Please provide an updated cost estimate for the revised plan <br />a. An updated cost estimate was submitted in the original plan and has also been attached to this <br />adequacy response. <br />Item #2: Please review Zach's letter and provide additional requested information <br />a. Twentymile has reviewed the letter provided by Zach Trujillo in regards to the thickener tank <br />foundation and base fill material drainage and has the following responses: <br />i. Only one lateral perforated drain pipe installed... <br />1. With the approval of NWCC, Twentymile installed only one perforated drain due <br />to the specification of the fill material being free draining. By using free draining <br />fill the water will be able to drain from under the tank area freely. Ideally the water <br />will drain to the path of least resistance which will be towards the limestone drain <br />that Twentymile placed on the northwest side of the tank foundation. Twentymile <br />will then place a 6 inch perforated pipe that will daylight into Pond D allowing the <br />water to drain freely and not cause any hydrostatic pressure or uplifting. <br />ii. No perimeter drainage system... <br />1. As indicated on the site plan submitted for TRI 9-93 Twentymile plans to place a <br />french drain on south side of the pump building to direct any surface water from <br />the south into pond D. A ditch will also be placed on the north side of the tank to <br />direct any water from north of the thickener tank and the west side of the wash <br />plant to drain into the constructed sump. In addition any run off from the east side <br />of the thickener tank and the south side of the wash plant will be captured by the <br />drainage culverts and discharged into the pre -sump before draining into pond D. <br />iii. Provide additional information that ensures proposed design to be sufficient.. <br />1. Twentymile has attached a letter from NWCC stating that the current design of <br />drainage is sufficient and that precautions will be followed during construction. <br />iv. Provide documentation of the underdrain system aside from drawings... <br />1. At the end of this response, Twentymile has provided a picture that documents the <br />limestone drain that was placed on the northwest side of thickener foundation. <br />Approximately 100 tons of limestone was placed to allow for adequate drainage <br />under the thickener tank. <br />