My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-03-21_REVISION - C1980004
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980004
>
2019-03-21_REVISION - C1980004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2019 10:26:24 AM
Creation date
3/21/2019 10:18:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Revision
Doc Date
3/21/2019
Doc Name
Application
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
MR61
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7T" STREET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245-4101, FAX: (970) 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />March 18, 2019 <br />Clayton Wein <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: McClane Canyon Mining LLC, McClane Canyon Mine <br />MR -61 MidTerm Permit Review No. 8 <br />Permit C-1980-004 <br />Dear Mr. Wein: <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />The DRMS prepared a midterm review document dated December 28,218 for the McClane <br />Canyon Mine (MCM). Section IV lists six adequacy questions. On behalf of McClane Canyon <br />Mining, LLC, following are its responses to the adequacy questions. The text and drawing <br />revisions will be incorporated into the permit through minor revision number 61. <br />1. DRMS — Please submit an updated officers and directors list for McClane Canyon <br />Mining, LLC if needed. <br />MCM —There is one change to Appendix A page 1. Joe Briton is no longer associated <br />with the McClane Canyon Mine. Revised Appendix A page 1 is enclosed. <br />2. DRMS - Please submit updated Section 2.1.3 — Production (starting on page 2-3) and <br />associated table (page 2-4) for production of McClane Mine from 2013 — 2018. <br />MCM — Page 2.05-2 was revised to update the anticipated production from the mine. <br />3. DRMS — Please submit an updated Figure 2.1-1, if needed, to reflect the actual schedule <br />up to 2018 and projected schedule for future years. <br />MCM —The mine plan, Figure 2.1-1, was updated to show the actual mining completed <br />in 2010. The mining schedule shows quarterly advance for the first year and annual <br />advance thereafter. There are no dates attached to the schedule. The mining schedule <br />will begin when mining resumes. The first paragraph on page 2.05-5 was revised to <br />indicate the Operator has obtained the lease modification. <br />
The URL can be used to link to this page
Your browser does not support the video tag.