My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-03-19_REVISION - M1991037
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1991037
>
2019-03-19_REVISION - M1991037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 8:39:29 AM
Creation date
3/19/2019 2:30:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991037
IBM Index Class Name
REVISION
Doc Date
3/19/2019
Doc Name
Request for Technical Revision
From
High Speed Mining, LLC
To
DRMS
Type & Sequence
TR10
Email Name
ERR
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of coto <br /> *e . TRIO , <br /> COLORAL .:LAMATION, MINING ANJ"TY <br /> /876 1313 Si ERR/mac -ever,Colorado 80203 ph(303)866-3567 <br /> � <br /> REQUEST FOR TECHNICAL REVISION(TR) COVER SHE EfrOiy�� <br /> File No.: M- 1991 -037 Site Name: Fairplay Au Pit �fo8y, anoy <br /> County Park TR# ORMS Use on1y) 0 3 <br /> Permittee: High Speed Mining, LLC o <br /> Operator(If Other than Permittee): b <br /> Permittee Representative: Ben Langenfeld N y <br /> Please provide a brief description of the proposed revision: <br /> Moving the on-site ditch to facilitate contiguous mining. Revised Map C-2 and Map F-1 <br /> w**wehed. <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application o I� <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or E <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted ° O <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 1 IOc, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑`� <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.